Laserfiche WebLink
Page 9 of 11 <br /> <br />Due to multiple irrigation system failures, a portion of the irrigation system has been shut off, <br />affecting the health of established landscaping. <br /> <br />In prior years, staff met with the Moller Ranch HOA to discuss the need for increased <br />assessments. Although initial support was limited, the HOA expressed interest in <br />understanding the long-term cost-benefit of a rate increase. Discussions resumed in summer <br />2024 regarding a possible Proposition 218 process to support the district's long-term capital <br />and maintenance needs. <br /> <br />Maintenance, water, and electricity costs are projected to total approximately $117,000 this <br />fiscal year, driven by major irrigation repairs, turf conversion, and tree pruning, resulting in an <br />estimated reserve draw of approximately $54,000. <br /> <br />Over the next decade, the total cost of necessary improvements is estimated at approximately <br />$1,000,000, including irrigation and landscape restoration, fence replacement, and other <br />capital needs. <br /> <br />Increases to Assessments <br />Without the proposed formation of replacement districts for Ponderosa-Del Prado and Bonde <br />Ranch as approved by a vote of the district owners this year, without an increase to <br />assessments based on the approved inflation factor for Moller Ranch and Oak Tree Farm, and <br />without an agreement to take over the maintenance for Windsor, then all 5 districts will require <br />an assessment increase through a future Proposition 218-compliant process. <br /> <br />The information in this report regarding future assessment increases is provided for <br />informational purposes only and to support the public hearing scheduled for July 21, 2026. No <br />additional City Council action regarding assessment increases is required at this time. Any <br />future recommended action will be brought to the City Council under a separate item. <br /> <br />PUBLIC COMMENT <br />As part of the annual noticing process for preliminary approval of the Engineer’s Report, staff <br />provides general information to residents within the LMDs. The annual notice includes the <br />name and telephone number of a staff contact for questions. <br /> <br />If staff receives questions prior to the public hearing on July 21, 2026, staff will provide the City <br />Council with those questions and responses at or before the hearing. <br /> <br />In addition, staff conducted extensive outreach for the Ponderosa-Del Prado and Bonde Ranch <br />Landscape Maintenance Districts, as described in the May 5, 2026, agenda report regarding <br />formation of replacement districts. <br /> <br /> CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) <br /> This action does not result in a direct physical change in the environment. In addition, maintenance <br />work within each LMD is categorically exempt from CEQA under Guidelines Section 15302, <br />“Replacement or Reconstruction.” Further, under CEQA Guidelines Section 15378(b)(4), this action is <br />not a “project” as it is a government funding mechanism that does not involve a commitment to a <br />specific project that may result in a potentially significant physical impact on the environment. <br /> <br />Page 74 of 617