My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGLAR MEETING AGENDA PACKET 6-16-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
061626 REGULAR
>
CITY COUNCIL REGLAR MEETING AGENDA PACKET 6-16-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2026 4:49:11 PM
Creation date
6/9/2026 4:46:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 3 <br />CIP NO. 22484 <br />Project Funding to Date Amount Totals <br />2022-2023 CIP Allocation (Fund 441 - Storm Drain Replacement <br />and Renovation)$785,457 <br />*Per CCAR 04/16/24 transfer to CIP 24676, East Vineyard <br />Detention Pond Outfall Repairs (159,000) <br />*Per CCAR 04/16/24 transfer to CIP 24677, Oak Tree Farm Pond <br />Outfall Repairs and Channel Stabilization (168,000) <br />*Per CCAR 04/16/24 transfer to CIP 24678, Augustin Bernal Trail <br />Creek Crossing Culverts and Retainin Wall (308,000) <br />2024-2025 CIP Allocation (Fund 441 - Storm Drain Replacement <br />and Renovation)449,543 <br />TOTAL PROJECT FUNDING <br />Project Expenditures (to-date) <br />Advertising $115 <br />ENGEO Incorporated (Design Professional Services Agreement) 82,580 <br />Miscellaneous Expenses 43 <br />TOTAL PROJECT EXPENDITURES $82,737 <br />Antcipated Project Expenditures <br />ENGEO Incorporated (Design Professional Services Agreement ) $4,399 <br />Frontline General Engineering Construction, Inc. - (Construction <br />Contract)284,950 <br />Construction Project Contingency (Approximately 15%)44,843 <br />ENGEO Incorporated (Design Professional Services Agreement - <br />Construction Support Services) 9,475 <br />Geocon Consultants, Inc (Geotechnical and Inspection Services)14,795 <br />TOTAL ANTCIPATED PROJECT EXPENDITURES $358,463 <br />TOTAL PROJECT EXPENDITURES $441,200 <br />Funding Balance/ (Shortfall) <br />Current Balance $158,800 <br />SASSAFRAS COURT STORM DRAIN INTERCEPTOR <br />$600,000 <br /> (FORMELY DESIGN AND CONSTRUCT STORM DRAIN) <br />Page 191 of 443
The URL can be used to link to this page
Your browser does not support the video tag.