My WebLink
|
Help
|
About
|
Sign Out
RES 2026043
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 10:32:43 AM
Creation date
6/10/2026 11:47:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES NO. 2026-043
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton I Water Shortage Contingency Plan EV\TON <br /> an emergency, the City has two interties with DSRSD and one intertie with Livermore. Per agreements <br /> with DSRSD and Livermore made in 1996 and 2011, respectively,the City can receive from each agency a <br /> reasonable quantity of water required during the emergency. <br /> The City has mutual aid agreements with the San Francisco Public Utilities Commission (SFPUC), <br /> Livermore, DSRSD, and Zone 7. The City also participates in the Water/Wastewater Agency Response <br /> Network (WARN), a statewide public utility mutual assistance organization. After exhausting its own <br /> resources,the City can call on these neighboring agencies for aid. <br /> 4.5.1 Interrupted Supply from Zone 7 <br /> If imported deliveries are interrupted,the City will coordinate with Zone 7 on available groundwater and <br /> stored supplies and implement applicable shortage stage actions immediately. <br /> Zone 7 has emergency generators (both portable and dedicated) at strategic locations in preparation for <br /> a regional power outage.These generators would allow both the Del Valle Water Treatment Plant and the <br /> Patterson Pass Water Treatment Plant to continue operating even under a power outage. Assuming no <br /> interruptions in surface water supply, Zone 7 would be able to provide continued service to all treated <br /> water contractors. If necessary to meet demand, Zone 7 would also operate groundwater wells, which <br /> have either a dedicated generator in place or have the necessary hook-ups to receive power from a <br /> portable generator. If the power failure were to occur during the high-demand summer season, Zone 7 <br /> may be unable to meet hourly peak demands throughout the transmission system. Zone 7 would work <br /> closely with the City and other retailers to manage demands to minimize impacts. <br /> 4.5.1.1 Unavailable SWP Water <br /> Zone 7, and therefore Pleasanton, relies heavily on the SWP for water supply. If SWP supplies are <br /> unavailable, the City will rely on available alternative deliveries and groundwater, evaluate projected <br /> deficits, and escalate stage actions as needed. <br /> Under this scenario and under current conditions, Zone 7 estimates that it would be able to make full <br /> deliveries to the retailers during non-summer months using a combination of groundwater and water <br /> stored in Lake Del Valle. During the peak demand of the summer months, however, Zone 7 will need to <br /> reduce deliveries to its retailers, including the City. Zone 7's analysis shows that Zone 7 has sufficient <br /> groundwater supply and pumping ability to serve the indoor water use needs of the service area over a <br /> one-year period; the availability of water supply for outdoor water use during the summer months will <br /> depend on the amount of water available in Lake Del Valle. Depending on timing and degree of recovery, <br /> the City may activate one of the water shortage levels in Section 3. <br /> 4.5.1.2 Unavailable Zone 7 Water <br /> If one or more Zone 7 turnouts are unusable, the City will reroute available supplies where feasible and <br /> prioritize service reliability while implementing shortage response measures. <br /> 4.5.2 Area-Wide Electrical Power Failure <br /> During prolonged power outages, the City will rely on backup power and emergency operations where <br /> available, prioritize critical facilities, and maintain shortage response messaging. Additionally, the City <br /> could receive water from emergency interties with DSRSD and Livermore if necessary. <br /> 4.6 Seismic Risk Assessment and Mitigation Plan <br /> CWC §10632.5(a) requires that UWMPs assess seismic risk and include a mitigation plan for the water <br /> system's seismic vulnerabilities and allows for incorporating a Local Hazard Mitigation Plan (LHMP) to <br /> meet this requirement, if the LHMP addresses seismic risk. Along with DSRSD and the cities of Dublin and <br /> ( environment Public Draft May 2026 <br /> &watoer 13 EKI Environment&Water, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.