Laserfiche WebLink
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-7 EKI Environment & Water, Inc. <br />in San Luis Reservoir is available. Zone 7 can lose water stored in San Luis Reservoir if the reservoir “spills” <br />(i.e., DWR needs the storage capacity to store its SWP water) during a wet year. Zone 7 typically targets <br />storing approximately 10,000 AFY of its Table A allocation as carryover in San Luis Reservoir. DWR is <br />considering expanding the San Luis Reservoir by 130,000 AF, as further discussed in Zone 7’s 2025 UWMP. <br />6.2 Groundwater <br /> <br />This section describes the City’s groundwater supply and Zone 7’s management of the Basin as the <br />exclusive Groundwater Sustainability Agency (GSA) within its jurisdictional boundaries (Figure 6-2) as <br />identified under the 2014 Sustainable Groundwater Management Act (SGMA). <br />Zone 7’s management of the Basin began over 50 years ago, long preceding the State’s implementation <br />of SGMA.9 Each year, Zone 7 prepares an Annual Report which provides updates on groundwater <br />conditions in the basin and the status of Zone 7’s groundwater management actions (Zone 7, 2026). The <br />2025 Water Year Annual Report can be found on the Zone 7’s website.10 <br />6.2.1 Basin Description and Status <br />Pleasanton relies on groundwater from the Livermore Valley Groundwater Basin (Basin; DWR No. 2-10). <br />The City’s local groundwater supply is within the Main Basin, which is the portion of the Basin that contains <br />high-yielding aquifers and generally produces the best-quality groundwater. <br /> <br />9 Zone 7, 2021. Alternative Groundwater Sustainability Plan for the Livermore Valley Groundwater Basin, dated <br />December 2021. Accessed From: https://sgma.water.ca.gov/portal/alternative/periodiceval/preview/8. <br />10 https://www.zone7waterca.gov/sites/main/files/file-attachments/2-010_wy_2025.pdf?1774635392 <br /> CWC §10631 <br />(b) Identify and quantify, to the extent practicable, the existing and planned sources of water available to the <br />supplier over the same five-year increments described in subdivision (a), providing supporting and related <br />information, including all of the following: <br />(4) If groundwater is identified as an existing or planned source of water available to the supplier, all of the <br />following information: <br />(A) The current version of any groundwater sustainability plan or alternative adopted pursuant to Part 2.74 <br />(commencing with Section 10720), any groundwater management plan adopted by the urban water supplier, <br />including plans adopted pursuant to Part 2.75 (commencing with Section 10750), or any other specific <br />authorization for groundwater management for basins underlying the urban water supplier’s service area. <br />(B) A description of any groundwater basin or basins from which the urban water supplier pumps groundwater. <br />For basins that a court or the board has adjudicated the rights to pump groundwater, a copy of the order or <br />decree adopted by the court or the board and a description of the amount of groundwater the urban water <br />supplier has the legal right to pump under the order or decree. For a basin that has not been adjudicated, <br />information as to whether the department has identified the basin as a high- or medium-priority basin in the most <br />current official departmental bulletin that characterizes the condition of the groundwater basin, and a detailed <br />description of the efforts being undertaken by the urban water supplier to coordinate with groundwater <br />sustainability agencies or groundwater management agencies listed in subdivision (c) of Section 10723 to <br />maintain or achieve sustainable groundwater conditions in accordance with a groundwater sustainability plan or <br />alternative adopted pursuant to Part 2.74 (commencing with Section 10720). <br />(C) A detailed description and analysis of the location, amount, and sufficiency of groundwater pumped by the <br />urban water supplier for the past five years. The description and analysis shall be based on information that is <br />reasonably available, including, but not limited to, historic use records.