My WebLink
|
Help
|
About
|
Sign Out
RES 2026043
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 10:32:43 AM
Creation date
6/10/2026 11:47:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES NO. 2026-043
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-14 EKI Environment & Water, Inc. <br />The Joint Groundwater Wells project will give the City the ability to access its full GPQ. The Project is <br />envisioned to include the following elements: <br />• Construction of new groundwater well(s) in the Bernal Subbasin with the goal to increase Zone <br />7’s groundwater production capacity and drought resiliency for the overall Tri-Valley region, <br />recover the City’s GPQ, and produce water supply that meets and exceeds all state and federal <br />water quality standards. <br />• Connection of the new groundwater well(s) to Zone 7’s water supply system and expansion of <br />treatment capacity at Zone 7’s existing Zone 7 Hopyard Treatment Facility. <br />• Delivery of the City’s GPQ via the Zone 7 water supply system (rather than the existing <br />configuration that involves direct delivery from dedicated City wells). <br />Zone 7 will serve as the lead agency in the evaluation, permitting, design, construction, operation, and <br />maintenance of the project. Pleasanton will support the project by providing necessary land rights and <br />paying the City’s share of project costs. <br />The project is phased, as follows: <br />• Phase 1 – In December 2025, the City and Zone 7 completed Phase 1 of the project, which <br />involved assessing the feasibility of jointly constructing and operating new wells in the Bernal <br />Subbasin. Phase 1 also involved drilling three test wells to confirm groundwater quality, well <br />capacity, and aquifer sustainability. The study found that a joint groundwater supply project in <br />the Bernal Subbasin is technically feasible, groundwater wells at Tennis Park and Hansen Park <br />would provide sufficient water yield and quality, and Zone 7 groundwater modeling indicated <br />the project would not affect groundwater basin sustainability 13. The feasibility study will set the <br />basis for future phases of work including full scale design and construction of the production <br />wells and associated infrastructure and construction. <br />• Phase 2 – Following the feasibility study and test wells, the project will move into design and <br />construction of the new production wells. The target completion date is end of 2029. <br />• Phase 3 – Once the wells are installed and equipped and required permits to operate are in <br />place, the City and Zone 7 will begin operating and maintaining the wells14. Pleasanton expects <br />the new production wells to be operational by 2030, and therefore in this UWMP, the City is <br />projected to utilize its full GPQ (an average of 3,500 AFY) starting in 2030. <br />Zone 7 is managing the Tri-Valley’s broader efforts in the Basin related to PFAS. Seven of Zone 7’s nine <br />active municipal wells have detected elevated PFAS concentrations. To date, PFAS has not been detected <br />in Zone 7’s Hopyard Wellfield (i.e., Hop 6 and Hop 9 wells) located in the Bernal Subbasin (western portion <br />of the Main Basin). <br />Zone 7 has developed a PFAS management strategy consisting of expanding and refining its PFAS <br />monitoring network, blending and treating groundwater to manage water quality, and diversifying <br />groundwater resources. In recent years, Zone 7 has implemented the following management activities 15: <br /> <br />13 For more information see the project description on Zone 7’s website: https://www.zone7waterca.gov/post/joint- <br />groundwater-wells-study <br />14 More information can be found on Zone 7’s website under the Joint Groundwater Wells Project <br />(https://www.cityofpleasantonca.gov/our-government/pleasanton-water/joint-groundwater-wells-project/) <br />15 Zone 7 Water Agency, 2026. Annual Report for the Sustainable Groundwater Management Program, 2025 Water Year <br />(October 2024-2025), Livermore Valley Groundwater Basin. https://www.zone7waterca.gov/sustainable-groundwater- <br />management-and-sgma
The URL can be used to link to this page
Your browser does not support the video tag.