My WebLink
|
Help
|
About
|
Sign Out
RES 2026043
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 10:32:43 AM
Creation date
6/10/2026 11:47:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES NO. 2026-043
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 6 2025 Urban Water Management Plan <br />Water Supply Characterization City of Pleasanton <br /> Public Draft | May 2026 <br /> 6-35 EKI Environment & Water, Inc. <br />Table 6-12 Recommended Energy Reporting: Single Delivery Product, Total Utility Approach (DWR <br />Table O-1B) <br />Water Delivery Product <br />Retail <br />Potable <br />Deliveries <br />Only for Water Delivery Products Under <br />Pleasanton’s Operational Control <br />Start Date of Reporting Period 1/1/2025 Sum of All <br />Water <br />Management <br />Processes <br />Non-Consequential <br />Hydropower End Date of Reporting Period 12/31/2025 <br />Is upstream embedded energy <br />in the values reported? <br />No <br />Units of Measure for Water AF Total Utility Hydropower Net Utility <br />Volume of Water Entering Process (AF) 12,663 12,663 <br />Energy Consumed (kWh) 1,238,681 1,238,681 <br />Energy Intensity (kWh/volume converted to <br />MG) <br /> 300 300 <br />Quantity of Self-Generated Renewable Energy <br />100,883 kWh <br />Data Quality (Estimate, Metered Data, Combination of Estimates and Metered Data) <br />Metered Data <br />Data Quality Narrative: <br />Data is provided by the City from flow meters in the water distribution system and electric <br />meters at its water facilities <br />Narrative: <br />Water management processes consuming energy include distribution/pumping, storage tank <br />operations and groundwater pumping and treatment. At one of its wells, the City has <br />photovoltaic solar panels that generate renewable energy. The amount of energy that Zone 7 <br />requires to treat raw water and deliver potable water to the City is excluded from this table. <br />As discussed in Section 6.5, the City owns and manages its sewage collection system and transports the <br />sewer flow to wastewater treatment plants owned and operated by DSRSD and Livermore. Pleasanton <br />also operates its recycled water distribution system, which has two facilities with significant energy <br />requirements: the Tassajara Storage Tank and the recycled water pump station at Ken Mercer Sports Park. <br />Table 6-13 shows the energy intensity associated with the City’s wastewater and recycled water services <br />(excluding treatment) in 2025. <br />
The URL can be used to link to this page
Your browser does not support the video tag.