My WebLink
|
Help
|
About
|
Sign Out
RES 2026043
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2026
>
RES 2026043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 10:32:43 AM
Creation date
6/10/2026 11:47:06 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES NO. 2026-043
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 7 2025 Urban Water Management Plan <br />Water Supply Reliability Assessment City of Pleasanton <br /> Public Draft | May 2026 <br /> 7-1 EKI Environment & Water, Inc. <br />7 WATER SUPPLY RELIABILITY ASSESSMENT <br /> <br />This section describes the City’s water service reliability under various hydrologic conditions, including a <br />severe drought for the next five years. The City’s existing and planned water management tools for <br />increasing water supply reliability are also addressed. Responses to actual water shortage conditions are <br />detailed in Section 8 of this plan. <br />The reliability of the City’s potable water supply is largely dependent upon its water supply from Zone 7 <br />and Zone 7’s water supply reliability policy. On October 17, 2012, the Zone 7 Board approved a revised <br />Water Supply Reliability Policy (Resolution No. 13-4230), which adopts the following level of service goals <br />to guide the management of Zone 7’s treated water (also referred to as M&I) supplies and its Capital <br />Improvement Program (CIP): <br />• Goal 1: Zone 7 will meet its treated water customers’ water supply needs, in accordance with <br />Zone 7’s most current Contracts for M&I Water Supply, including existing and projected demands <br />as specified in Zone 7’s most recent UWMP, during normal, average, and drought conditions, as <br />follows: <br />— At least 85% of M&I water demands 99% of the time <br />— 100% of M&I water demands 90% of the time <br />• Goal 2: Provide sufficient treated water production capacity and infrastructure to meet at least <br />80% of the maximum month M&I contractual demands should any one of Zone 7’s major supply, <br />production, or transmission facilities experience an extended unplanned outage of at least one <br />week. <br />To evaluate water service reliability, Zone 7 developed an advanced water supply management model for <br />the 2022 WSE Update, which superseded the previous spreadsheet-based model developed for the 2019 <br />WSE Update. The model is implemented in RiverWare and simulates Zone 7’s updated demand, integrated <br />supply, storage, conveyance, treatment, and groundwater operations on a monthly time step, allowing <br />the analysis to reflect seasonal patterns, operational constraints, water rights, and year-to-year carryover <br />storage behavior. Hydrologic uncertainty is represented using the Index Sequential Method, which <br />generates multiple hydrologic “traces” by shifting through the historical record so that wet, average, and <br />dry sequences (including multi-year droughts) are preserved while providing many plausible future <br />sequences for evaluation. The historical hydrologic inputs (e.g., SWP availability and local hydrology <br />proxies) are adjusted to account for climate change impacts and aging infrastructure in the SWP. Each <br />trace is simulated across the full planning horizon (2025-2050). In this modeling effort, Zone 7 defines <br />operating rules that represent how the system is managed as different supply sources come online or go <br />offline—this includes priorities for use of SWP deliveries, local surface water, groundwater pumping, <br />storage drawdown and refill targets, and use of banking and transfers—along with key physical constraints <br />(e.g., conveyance capacities, treatment limits, pumping limits, and storage capacities). For this 2025 <br /> CWC §10620 (f) <br />An urban water supplier shall describe in the plan water management tools and options used by that entity that <br />will maximize resources and minimize the need to import water from other regions. <br /> CWC §10630.5 <br />Each plan shall include a simple lay description of how much water the agency has on a reliable basis, how much <br />it needs for the foreseeable future, what the agency’s strategy is for meeting its water needs, the challenges <br />facing the agency, and any other information necessary to provide a general understanding of the agency’s plan.
The URL can be used to link to this page
Your browser does not support the video tag.