Laserfiche WebLink
Section 7 2025 Urban Water Management Plan <br />Water Supply Reliability Assessment City of Pleasanton <br /> Public Draft | May 2026 <br /> 7-5 EKI Environment & Water, Inc. <br />7.1.1.2 Groundwater <br />Refer to Section 7.1.2 for constraints on groundwater supplied by Zone 7 and the City. <br />7.1.1.3 Arroyo Valle and Lake Del Valle <br />ACWD and Zone 7 both have water rights to divert water from the Arroyo Valle. This water is captured <br />and stored in Lake Del Valle, which is owned and operated by DWR. DWR utilizes Lake Del Valle for flood <br />control, water supply, and recreation. Typically, DWR lowers the lake elevation after Labor Day, allowing <br />Zone 7 and ACWD to put runoff from the Arroyo Valle to beneficial use. In the summer months, lake <br />elevations are raised for recreational purposes. Historically, access to Zone 7’s stored water in Lake Del <br />Valle has not been problematic, unless there is an outage on the Del Valle Branch pipeline. Zone 7 closely <br />coordinates use of Arroyo Valle water with both ACWD and DWR. <br />Water collected from the local watershed is protected under the SBA Watershed Protection Program Plan. <br />In general, the water quality of Arroyo Valle runoff is good and does not affect the reliability of this water <br />supply; however, as noted above, T&O can also affect supplies from Lake Del Valle. Zone 7 treats T&O <br />using ozonation, although a switch to groundwater supplies is sometimes necessary under excessive levels <br />of T&O compounds. Algal blooms in the lake can also reduce production capacities, though adding <br />ozonation at DVWTP and PPWTP has significantly reduced the impact. <br />7.1.1.4 Local Storage <br />Constraints for Zone 7’s existing local storage options, the Main Basin and Lake Del Valle, are discussed in <br />Sections 7.1.2 and 7.1.1.3, respectively. The COLCS project, once constructed, will increase Zone 7’s local <br />storage. Currently, Zone 7 is planning to construct the project using the two lakes that are available, Lake <br />I and Cope Lake. These lakes will provide additional local storage in the near term. However, the transfer <br />dates for the remaining lakes are uncertain, as the timing of gravel mining operations and reclamation is <br />not yet known, and a full transition may extend through 2060. Zone 7 continues to work closely with <br />mining companies and quarry operators to coordinate planning efforts. Through this project, Zone 7 can <br />enhance its use of the available lakes during the interim period before all lakes are transferred to Zone 7’s <br />ownership. <br />7.1.1.5 Non-Local Storage <br />Access to banked water in Semitropic and Cawelo, which are both downstream of Zone 7, requires <br />exchange(s) with other SWCs located south of Kern County (e.g., Metropolitan Water District of Southern <br />California). There must be sufficient water flowing through the Delta and California Aqueduct system to <br />facilitate these exchanges, which could be challenging during a drought. Furthermore, the banked water <br />must be conveyed through the Delta, rendering this supply susceptible to the Delta disruptions described <br />in Section 7.1.1.1.1. <br />During the 2020-2022 drought, access to banked water became uncertain because of the historically low <br />Table A allocation (leading to minimal amounts of water moving through the SWP) and the potential <br />cessation of pumping in the Delta to control salinity intrusion. DWR was able to manage salinity so that <br />Delta pumping could continue, and with coordination among stakeholders including Zone 7, DWR <br />prioritized the delivery of banked water to Zone 7 and other SBA contractors. Ultimately, despite severe <br />drought conditions in 2021 and 2022 and historic low 5% SWP allocation, Zone 7 was able to successfully <br />recover 20,000 AF from both groundwater banks. Between 2020 and 2022, Zone 7 recovered <br />approximately 21,000 AF from non-local storage.