Laserfiche WebLink
Section 7 2025 Urban Water Management Plan <br />Water Supply Reliability Assessment City of Pleasanton <br /> Public Draft | May 2026 <br /> 7-7 EKI Environment & Water, Inc. <br />Zone 7 continues to study the groundwater basin and utilize new tools (e.g., a recently improved <br />groundwater model) to better understand the volumes of groundwater extraction possible under various <br />Basin conditions while maintaining groundwater elevations above the historic-low groundwater <br />elevations that have been reached in certain portions of the Main Basin (“historic lows”). Zone 7 also plans <br />to augment its ability to recharge the Main Basin (e.g., through the COLs) to increase local storage and <br />allow for more pumping when necessary. Recharging the Main Basin will improve both water supply <br />reliability and salt management. Zone 7 is evaluating opportunities to construct and operate an additional <br />demineralization facility to continue to decrease the salt content of the Main Basin. <br />Finally, the City and Zone 7 are advancing the Joint Groundwater Wells Study to evaluate the feasibility of <br />adding new municipal production wells in the Bernal Subbasin. The goal of these additional wells is to <br />increase groundwater production capacity, enhance drought resiliency, and provide greater operational <br />flexibility in managing groundwater sustainability during extended droughts or surface water supply <br />constraints. <br />The City has a GPQ of 3,500 AFY from the Main Basin, which comprises approximately 20% of its water <br />supply. The City may also carry-over any unused portion of its annual GPQ up to a total of 700 AF. The <br />successful completion of the Joint Groundwater Wells project will allow the City to once again pump its <br />full GPQ and reduce the risk of future PFAS contamination. Zone 7 established GPQs for the Main Basin <br />based on the natural sustainable yield. As such, the City’s groundwater supply from its GPQ is considered <br />reliable under all hydrologic conditions. <br />7.1.3 Recycled Water <br />The recycled water that the City receives comes from DSRSD’s RWTF and the LWRP, which are described <br />in Section 6.5.2. Both facilities produce Title 22 disinfected tertiary recycled water. The City anticipates <br />no significant changes to the land uses in either DSRSD’s or Livermore’s wastewater service area; <br />therefore, it does not anticipate any changes to the quality of the wastewater effluent used to produce <br />recycled water. The City does not expect recycled water quality issues to impact its ability to reliably <br />deliver recycled water to its customers. <br />On March 25, 2019, DERWA found that it cannot meet the combined peak demands and projected <br />demands of its member agencies (DSRSD and EBMUD) and its retailer, Pleasanton. DERWA approved <br />Resolution No. 19-3 (Appendix E) requesting that its member agencies take action to reduce recycled <br />water demands and implement a connection moratorium. As discussed in Sections 6.5.2 and 6.5.4, the <br />City maintains the first right to use the secondary effluent produced from wastewater originating from <br />the City’s wastewater collection system for recycling. As of 2023, the City also owns the treatment capacity <br />rights of up to 2.7 MGD of recycled water from DSRSD’s RWTF While the City’s recycled water supply is <br />limited by the secondary wastewater effluent from its service area and the treatment capacity of DSRSD’s <br />RTWF, this supply is expected to meet the City’s current and projected recycled water demands. <br />7.1.4 Water Quality <br /> <br />Impaired water quality also has the potential to affect water supply reliability. Pleasanton has and will <br />continue to meet all state and federal water quality regulations. All drinking water standards are set by <br />the EPA under the authorization of the Federal Safe Drinking Water Act of 1974. In California, the SWRCB’s <br /> CWC §10634 <br />The plan shall include information, to the extent practicable, relating to the quality of existing sources of water <br />available to the supplier over the same five-year increments as described in subdivision (a) of Section 10631, and <br />the manner in which water quality affects water management strategies and supply reliability.