Laserfiche WebLink
Section 7 2025 Urban Water Management Plan <br />Water Supply Reliability Assessment City of Pleasanton <br /> Public Draft | May 2026 <br /> 7-12 EKI Environment & Water, Inc. <br />7.3 Supply and Demand Assessment <br /> <br />This section presents comparisons of projected water supplies and demands from 2025 through 2045 <br />under the following hydrologic conditions: normal year, single dry year, and five consecutive dry years. <br />The City’s projected demands are presented in Section 4, while supply sources are described in Section 6. <br />Unless otherwise noted, it is assumed demand projections will not change with hydrologic conditions. In <br />other words, demands are assumed to be unconstrained unless they are limited by available supplies. <br />7.3.1 Normal Year Supply and Demand Assessment <br />The City’s normal year supplies include: <br />• Purchased supplies from Zone 7 <br />• 3,500 AFY of groundwater pumped by the City from the Main Basin <br />• Up to 1,340 AFY of recycled water <br />Based on the reliability assessment in the 2025 UWMP, Zone 7 predicts they can meet all retailer demands <br />during a normal year. Therefore, Table 7-4 shows that in normal years the City’s supplies are adequate to <br />meet projected demands. The supply and demand totals are consistent with those in Table 6-11 and <br />Table 4-5, respectively. <br />Table 7-4 Normal Year Supply and Demand Comparison (DWR Table 7-2) <br /> 2030 2035 2040 2045 <br />(AF) (AF) (AF) (AF) <br />Supply totals <br />(from DWR Table 6-9) 16,401 17,288 18,178 19,172 <br />Use totals <br />(from DWR Table 4-2) 16,401 17,288 18,178 19,172 <br />Surplus/(shortfall) 0 0 0 0 <br />7.3.2 Single-Dry Year Supply and Demand Assessment <br />In Chapter 7 of its 2025 UWMP, Zone 7 has indicated it can meet retailer demands during single dry years <br />through 2045. Therefore, Zone 7 supplies to the City are assumed to equal the City’s projected potable <br />water demands after accounting for the City’s GPQ. Recycled water supply is assumed to be unaffected <br />by the dry conditions. Table 7-5 shows that the City’s supplies are adequate to meet projected demands <br />during single dry years. <br /> CWC §10635(a) <br />Every urban water supplier shall include, as part of its urban water management plan, an assessment of the <br />reliability of its water service to its customers during normal, dry, and multiple dry water years. This water supply <br />and demand assessment shall compare the total water supply sources available to the water supplier with the <br />long-term total projected water use over the next 20 years, in five-year increments, for a normal water year, a <br />single dry water year, and a drought lasting five consecutive water years. The water service reliability assessment <br />shall be based upon the information compiled pursuant to Section 10631, including available data from state, <br />regional, or local agency population projections within the service area of the urban water supplier.