My WebLink
|
Help
|
About
|
Sign Out
CLIMATEC, LLC
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
C
>
CLIMATEC, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2026 4:42:45 PM
Creation date
6/12/2026 4:42:20 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Other
Contract Type
New
NAME
CLIMATEC, LLC
Contract Record Series
704-05
Munis Contract #
N/A
Contract Expiration
12/31/2029
NOTES
CITYWIDE ENEERGY INFRASTRUCTURE MODERNIZATION PROGRAM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Energy Services Agreement 19 04/21/2026 <br />EXHIBIT “B” <br />SCOPE OF WORK FOR IMPLEMENTATION <br /> <br /> <br />Implementation <br />After CITY approves the DA deliverables, this section may be amended to include a <br />detailed scope of work description of measures to be installed at each location and <br />technical details will be included as exhibits. <br />Subject to Council’s separate approval of an amendment to this Agreement, ESCO’s <br />implementation scope will include final design, engineering, permits, fees, approvals, <br />project management, installation, startup, training, checkout, warranty, and insurance <br />specifically associated with the agreed upon Program to be performed. Upon <br />authorization for Program implementation, Parties will hold a kick-off meeting with <br />applicable departments to coordinate mobilization efforts and establish an effective <br />construction management framework. <br />Assuming the Agreement amendment is executed and funding is secured, ESCO will <br />complete final elements of design and engineering such as land surveys, geotechnical <br />studies, and preparation of design documents and drawings required to prepare <br />submittal packages, obtain permits and procure equipment. Prior to initiating <br />construction, ESCO will provide submittals and engineered drawings (where required) <br />for CITY’s technical review and written approval. All construction and associated <br />cleanup will be performed and scheduled to minimize disruptions for CITY operations. <br />A detailed project implementation plan and comprehensive construction schedule will <br />be provided after completing submittal review and equipment procurement. <br />PHONE (512) 358-0703 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: 2FACAA06-C000-8E3B-8363-DD2D556A0D51Docusign Envelope ID: 8C132635-A597-8F5D-8082-3EB7B8AE19BF
The URL can be used to link to this page
Your browser does not support the video tag.