My WebLink
|
Help
|
About
|
Sign Out
ORD 2306
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2301 - 2400
>
ORD 2306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 4:20:57 PM
Creation date
6/15/2026 3:45:26 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
6/2/2026
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 CC-2026-__, May 19, 2026 <br />24 of 36 <br />public utilities and appurtenances thereto as subject to regulation under <br />Pleasanton Municipal Code Chapter 13.04. Consistent with California <br />Government Code Section 66439(d)(3), the offer shall include the statement, <br />“The real property described below is dedicated as an easement for public <br />purposes…” <br />c. Dedications for public access over sidewalk or driveway areas shall exclude the <br />City’s obligation for maintenance pursuant to California Streets and Highways <br />Code § 5610. <br />d. An electronic gate proposed on “Street B Private” will restrict access. Similarly, <br />gates will be installed on “Street A Private”, also restricting access. Any <br />easements granted to the City should therefore be explicit in allowing access for <br />maintenance/inspection of public utilities and emergency response providers <br />while excluding the general public and any roadway maintenance by the City. <br />67. GEOTECHNICAL ENGINEER – DESIGN CERTIFICATION: The project developer <br />shall comply with the recommendations of the project’s geotechnical investigation <br />report, as prepared by a California-licensed Geotechnical Engineer or Certified <br />Engineering Geologist. Said professional shall certify on the plans that the <br />design complies with the recommendations of the report. (Address this condition prior to <br />improvement plan approval) <br />68. LIQUEFACTION. Liquefaction potential has been identified as a geotechnical issue for <br />Lots 29 and 30 (See Section 4.3 of the updated Cornerstone Earth Group report. The <br />project developer shall provide additional investigation, analysis, and recommendations <br />from the geotechnical engineer-of-record during the plan preparation phase of the <br />project. All recommendations shall be implemented during design and construction of <br />these lots. (Address this condition prior to improvement plan approval) <br />69. LATERAL SPREADING. Lateral spreading has been identified as a geotechnical issue <br />for structures constructed near the Devany Creek culvert that extends beneath Dublin <br />Canyon Road. The foundations for these structures shall be designed in accordance <br />with recommendations from the geotechnical engineer-of-record to tolerate impacts due <br />to seismically-induced creek bank movement. (Address this condition prior to <br />improvement plan approval) <br />70. GEOTECHNICAL FINAL REPORT: At the conclusion of construction, the project <br />developer shall submit to the City a final report from the Geotechnical Engineer or <br />Certified Engineering Geologist testifying to the successful completion of all material <br />testing and/or observation work performed. The final report must provide assurance that <br />all recommendations had been strictly followed. The project developer shall bear all
The URL can be used to link to this page
Your browser does not support the video tag.