Laserfiche WebLink
P18-0078, P18-0079, P18-0081, PUD-130, and Tract 8569 CC-2026-__, May 19, 2026 <br />26 of 36 <br />75. TEMPORARY TRAFFIC CONTROL: Work in the public right-of-way or publicly- <br />accessible easement areas require submittal, review, approval, and implementation of a <br />temporary traffic control plan. The plan shall be in writing and subject to review and <br />approval of the City’s Traffic Engineer. The plan must conform to the California Manual <br />on Uniform Traffic Control Devices (CA MUTCD), with specific emphasis on Part 6 <br />“Temporary Traffic Control”. If flaggers will be utilized, said personnel must be trained in <br />the proper fundamentals of flagging moving traffic before entering the right-of-way. The <br />City may demand to see evidence of said training before allowing said personnel into <br />the right-of-way. (Address this condition during construction) <br />76. HIGH VISIBILITY SAFETY APPAREL: All workers on foot who are exposed to the <br />hazard of vehicular traffic shall wear warning garments such as vests, jackets, or shirts <br />manufactured in accordance with the requirements of the American National Standards <br />Institute (ANSI)/International Safety Equipment Association (ISEA) 107-2004 <br />Performance Class 2, high visibility safety apparel and headwear, or any updates <br />adopted by Cal OSHA. During hours of darkness, warning garments shall be <br />retroreflective with visibility from a minimum 1,000 feet. (Address this condition during <br />construction) <br />77. EXCAVATION SAFETY: All excavations must be performed in conformance with <br />California Government Code Sections 4216, et seq. No excavation shall occur until <br />proper notice is provided to Underground Service Alert (usanorth811.org) by calling <br />either 811 or 800-642-2444 at least 72-hours prior to the work so buried utilities can be <br />marked. All excavations shall be covered or barricaded to prevent entry when work is <br />inactive. Open excavations in the public right-of-way must be covered by skid-resistant <br />steel plates that are firmly affixed to the surface with leading edges ramped. <br />Excavations 5-feet and deeper require a protective system as defined by Cal-OSHA. If a <br />shoring system or trench boxes will be utilized as the protective system, said system <br />shall either be manufactured and installed according to manufacturer recommendations, <br />or designed by a registered professional engineer and installed according to approved <br />plans. No excavation shall be performed atop or adjacent to a high-risk facility until <br />authorized by the owner of the facility. High-risk facilities are defined as gas <br />transmission pipelines and hazardous liquid pipelines as regulated by the U.S. <br />Department of Transportation Pipeline and Hazardous Materials Safety Administration <br />(US DOT PHMSA) (Address this condition during construction). <br />78. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the <br />project shall pollutants be allowed to enter, clog, or contaminate storm drain pipe <br />networks or open stormwater channels in violation of Pleasanton Municipal Code §§ <br />9.14.080, et seq. The project developer shall contain all trash and debris for proper <br />disposal to authorized landfills or recyclers. Erosion control features shall be deployed