Laserfiche WebLink
CITY OF PLEASANTON RATE SHEET 2026 <br />LABOR UOM PRICE <br />Project Manager Hourly 150.00$ <br />Supervisor Hourly 145.00$ <br />Haz-Waste Transporter/Technician Hourly 135.00$ <br />Technician Hourly 130.00$ <br />Equipment Operator Hourly 140.00$ <br />Driver Hourly 140.00$ <br />EQUIPMENT <br />Pick-Up Truck Daily 150.00$ <br />Gear Truck Daily 200.00$ <br />Skid Steer w/grapple bucket and trailer Daily 800.00$ <br />Packer Truck Hourly 55.00$ <br />Roll off truck w/1-40 yard open top bin Hourly 55.00$ <br />Dual Bin Transport Truck (Rocket Launcher) w/2-40 yard open top bins Hourly 60.00$ <br />HAZARDOUS WASTE CONTAINMENT AND DISPOSAL <br />(Cost of disposal is included in unit price) <br />1 quart sharps container Per Each 30.00$ <br />1 gallon sharps container Per Each 40.00$ <br />5 gallon poly bucket Per Each 200.00$ <br />55 - 95 gallon Bio-hazardous poly drum Per Each 300.00$ <br />55 gallon poly drum Per Each 600.00$ <br />55 gallon steel drum Per Each 600.00$ <br />Tri-Wall Box / E-Waste Disposal Per Each 350.00$ <br />PPE / 6 mil bags Per Day 100.00$ <br />NON-HAZARDOUS TRASH <br />Landfill trash Per Ton 175.00$ <br />Exhibit A <br />Assumptions: * 4 hour minimum will apply <br />Docusign Envelope ID: 454B37BC-E736-8121-8335-9195AC5F2386