My WebLink
|
Help
|
About
|
Sign Out
NRC ENVIRONMENTAL SERVICES, INC. dba US ECOLOGY
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
N
>
NRC ENVIRONMENTAL SERVICES, INC. dba US ECOLOGY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2026 4:59:26 PM
Creation date
6/30/2026 4:55:50 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
As-Needed Agreement for Maintenance or Trade
Contract Type
Amendment
NAME
NRC ENVIRONMENTAL SERVICES INC. dba US ECOLOGY
Contract Record Series
704-05
Munis Contract #
2024087
Contract Expiration
6/30/2028
NOTES
HAZARDOUS WASTE DISPOSAL, DECONTAMINTATION AND HAULING SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. Scheduled Project Work. Non-routine scheduled project work where Contractor <br />submits a quotation to the City will be compensated on a time and materials, unit price <br />and/or lump sum basis in accordance with the submitted quotation as well as the actual <br />pay quantities achieved (i.e., amount of waste collected, number of hours worked etc.). <br />Should Contractor discover that the cost of time and materials, will exceed the quoted <br />amount by 120%, Contractor must notify and provide additional information for the <br />reason of the excess cost to the City’s Program Manager, who will review and provide <br />authorization to continue said project. <br /> E. Safety Training/Procedures <br />Contractor must provide a copy of its safety training program that includes, but are not <br />limited to, training staff on hazardous material, Safety Data Sheets, safety procedures, and <br />safe work practices. This is required before Contractor can begin performing its services. <br /> <br />F. Traffic Control. The Contractor is required to provide all safety cones, sign boards, <br />arrow boards and other appropriate measures and equipment as prescribed by the <br />Department of Transportation Manual on Uniform Traffic Control Devices (MUTCD) <br />for traffic control. <br /> <br />G. Vehicle/Uniforms/Equipment <br />1. As-needed vehicle access will be discussed in advance and routes will be determined <br />by City staff based upon the location of the job site for waste removal and/or site <br />decontamination. <br />2. All Vehicles utilized by the contractor shall have wording which clearly identifies <br />the contractor/company. <br />3. All employees on site are to wear clothing which clearly identifies the <br />contractor/company. <br />4. Transportation of equipment on public streets shall comply with California State <br />Vehicle Code with Department of Transportation, and under the guidance of <br />California Environmental Protection Agency Department of Toxic Substances <br />Control (DTSC). <br /> <br /> <br />Docusign Envelope ID: B932AE1D-315D-8F6B-8092-3E7AD14B95CF
The URL can be used to link to this page
Your browser does not support the video tag.