My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETTIMG AGENDA PACKET 7-7-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
070726 REGULAR
>
CITY COUNCIL REGULAR MEETTIMG AGENDA PACKET 7-7-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 11:54:14 AM
Creation date
7/2/2026 11:51:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/7/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br />transmission pipeline, Contractor shall pay for construction of <br />modifications to the transmission pipeline, including insertion of a new <br />tee or other connection and associated in-line valves and the isolation <br />valve on the tee, serving the turnout facility,in addition to any other <br />costs described in Section 15. <br />18. Operations and Damage to Facilities <br />Each Party shall exercise reasonable care in the performance of its obligations and <br />rights <br />impaired or damaged. In the event that Contractor, by carrying out its obligations under <br />this Agreement or in any other course of its operations damages Zone 7 facilities or <br />structures, including but not limited to turnouts installed under this Agreement, the <br />Contractor shall reimburse Zone 7 for costs of repairing those facilities. <br />19. Inspection of Facilities <br />Contractor may, upon request, and in the presence of a Zone 7 representative, inspect <br />its associated turnout facilities. <br />monthly flow measurements and records taken from that Contractor turnout facilities. <br />20. Ranges of Flow <br />The range of flow rates of water through a turnout facility may vary considerably over <br />the contract term. A normal range of flow rates for a turnout facility is hereby <br />established as from 10% to 100% of the maximum approved design flow rate. <br />Prior to the turnout design, Contractor shall provide Zone 7 with the anticipated <br />ultimate (future) maximum flow rate and anticipated present design range of flow rates, <br />facility. The maximum design flow rate shall not exceed 10 times the minimum design <br />flow rate for this range in normal installations as approved by Zone 7. <br />Contractor is responsible for regulating flow demands through the turnout facility such <br />that the range of flow rates set forth in the turnout design criteria will be maintained. <br />Zone 7 may at its sole discretion elect to regulate flows. <br />Zone 7 may modify turnout facilities upon request of Contractor or at such time that the <br />actual flow rate exceeds the maximum design flow rate or is less than the minimum <br />design flow rate; provided, however, that flow rates resulting from emergencies shall <br />not apply to such requirement for modification. Said modification will be at the expense <br />of the Contractor and payment thereof shall be invoiced to Contractor in accordance <br />with Section 32. <br />Page 65 of 214
The URL can be used to link to this page
Your browser does not support the video tag.