Laserfiche WebLink
14 <br />becoming effective. Upon adoption the rate schedule will continue in full force and <br />effect until modified or repealed by the Board. Such rates shall be developed with <br />applicable laws and regulations, including the California Constitution. <br />30. Recharge Fee <br />In any calendar year, if Contractor exceeds its Groundwater Pumping Quota plus any <br />accumulated carry-over, Contractor shall be assessed a Recharge Fee for each acre foot <br />of water (or portion thereof) in excess of said amount. The Recharge Fee schedule shall <br />be calculated to reflect the cost to Zone 7 of replenishing the Main Basin in the amount <br />of the excess extraction, including but not limited to the cost to purchase or develop the <br />water, as well as the cost to construct, maintain, and operate the facilities needed to <br />import, distribute, store, treat, and recharge said water into the Main Basin for the <br />benefit of each M&I Contractor. <br />The recharge fee shall be charged to Contractor in accordance with the rates included <br />in the adopted rate schedule. Notwithstanding the foregoing, the Recharge Fee may be <br />suspended by Zone 7 in the event that Zone 7 determines that other funding <br />mechanisms are in place that adequately address the costs of replenishing groundwater <br />in the Main Basin. <br />31. In-Lieu Treated Water Credit <br />Zone 7 shall include an In-Lieu Treated Water Rate in the adopted rate schedule. In any <br />calendar year in which the Contractor has participated in In-Lieu Treated Water <br />deliveries as set forth in Section 27, Zone 7 shall determine the amount of delivered <br />treated water that should be charged at the adopted In-Lieu Treated Water rate. Zone <br />7 shall reconcile deliveries and credit or make payment to the Contractor the difference <br />between the treated water rate and the In-Lieu Treated Water rate on or before May 1 <br />of the calendar year following such deliveries. <br />Contractor acknowledges that any credits or payments received under this Section are <br />received in-lieu of the Contractor's right to extract its Groundwater Pumping Quota, and <br />Contractor agrees that its Groundwater Pumping Quota and any accumulated carry-over <br />shall be reduced by an amount equivalent to the amount of In-Lieu Treated Water <br />delivered by Zone 7 to Contractor for the year in which the delivery is made. <br />32. Payments and Invoicing <br />Contractor shall be invoiced on a calendar month basis for treated water deliveries, <br />temporary treated water service, and recharge fees based on the data obtained <br />pursuant to Sections 10 and 26. Contractor shall pay promptly all charges invoiced by <br />Zone 7 for charges incurred in the preceding month and to become due and payable <br />within 30 days from date of invoice. <br />Page 69 of 214