Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />4 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />on the northern frontage of Lot 30 facing Dublin Canyon Road to facilitate access to a proposed <br />EBRPD trailhead. <br />Landscape elements would be native and native-type species that are drought-tolerant and wind <br />resistant to conserve water use. No artificial landscape plantings are proposed. High-efficiency drip <br />irrigation would also reduce outdoor water use. A proposed 30-foot minimum firebreak planting <br />area would be installed behind proposed residences behind Lots 1 and 2 near the intersection of <br />Dublin Canyon Road and Street B, and behind Lots 13 and 14 on the northern end of Court C. <br />The proposed project would include lighting elements for security and wayfinding typical of a <br />residential subdivision. Lighting elements would include roadway lighting, accent lighting at the <br />entrance from Dublin Canyon Road to Street B, and accent lighting associated with landscaping and <br />single-family residences. A community identification plaque would be provided at the development <br />site’s entrance at the intersection of Dublin Canyon Road to Street B. <br />The proposed project would include bioretention areas and vaults for on-site stormwater <br />management near the proposed main entrance at the intersection of Dublin Canyon Road and Street <br />B and along Street A. Proposed 12-inch storm drains throughout the development site would be <br />provided connections to bioretention areas for pre-treatment before draining into a 12-inch storm <br />drain located in Dublin Canyon Road. The proposed storm drains would connect to a new 24-inch <br />storm drain located in Dublin Canyon Road by extension of an 18-inch storm drain located at the <br />intersection of Street A and Street B and within Street A. Additionally, 12- and 8-inch storm drains <br />are also proposed within Court C. A 12-inch storm drain is proposed along private and public roads <br />surrounding Lots 29 and 30, which would connect to existing facilities adjacent to Dublin Canyon <br />Road to the north. <br />Pleasanton Garbage Services would provide weekly solid waste and recycling services. Each <br />residential household would be provided with a garbage and recycling cart. <br />Pacific Gas and Electric Company (PG&E) would provide gas and electric service. Pacific Bell <br />Telephone Company (Pac Bell), Xfinity, and AT&T would provide telecommunications services. <br />Both the 28 detached single-family residential units and the two existing single-family residential <br />units proposed for development are located within the City’s UGB and would be annexed into the <br />City as part of the proposed project. <br />Open Space <br />The proposed project would preserve approximately 117.1 acres of designated open space on four <br />parcels: Parcel A, which would contain 39.9 acres to be owned and managed by the Homeowner’s <br />Association (HOA); Parcel B, which would contain 69.3 acres to be dedicated to the EBRPD; Parcel C, <br />which would add another 7.6 acres of open space to be retained by the Lester Family for future <br />dedication to EBRPD; and Parcel D would contain 0.30 acre to be owned and managed by the HOA. <br />Throughout the duration of development for the proposed project, Parcel C would be retained by <br />the Lester Family for continued agricultural use. However, as part of a “life estate dedication,” upon