My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet 04222026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
04-22
>
Planning Commission Meeting Agenda Packet 04222026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:22:28 AM
Creation date
7/8/2026 11:15:26 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
593
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br />FirstCarbon Solutions 53 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />The Draft EIR concludes that while the project would result in environmental changes, these would <br />not be significantly inefficient, unnecessary, or wasteful, and would be comparable to other <br />residential developments in the region. <br />The Lead Agency finds that the proposed project would not result in significant irreversible changes. <br />1.12 - Mitigation Monitoring and Reporting WƌŽŐĂŵ <br />Pursuant to Public Resources Code Section 21081.6 and Guidelines Section 15091(d), the Lead <br />Agency adopts the MMRP prepared for the proposed project, attached as Appendix A. <br />Implementation of the mitigation measures contained in the MMRP is hereby made a COA of the <br />proposed project. The MMRP is incorporated by reference in these Findings. In the event of any <br />inconsistencies between the mitigation measures set forth herein and the MMRP, the MMRP shall <br />control. <br />1.13 - Findings Regarding Recirculation <br />During the public review period after the Draft EIR was published, the Lead Agency received certain <br />additional information. Lead Agency staff and consultants involved in preparing the various studies, <br />reports and analyses included in the Draft EIR have also presented additional information since the <br />publication of the Draft EIR. Some of this information was contained in comments submitted on the <br />Draft EIR, and in responses to those comments contained in the Final EIR. Other information was <br />presented at or before public meetings/hearings on the EIR. The EIR incorporates feasible mitigation, <br />additions, clarifications, modifications, and other changes, in response to comments and as <br />determined appropriate by Lead Agency staff and required under CEQA. <br />Under Laurel Heights Improvement Ass'n v. Regents of Univ. of Cal. (1993) 6 C4th 1112 (Laurel <br />Heights II) and the CEQA Guidelines (14 California Code of Regulations [CCR] § 15088.5(a)(3)), when <br />information added to the Final EIR consists of a suggested additional mitigation measure, <br />recirculation is required only if the new mitigation measure meets all of the following criteria (South <br />County Citizens for Smart Growth v. County of Nevada (2013) 221 CA4th 316, 330): <br />xx It is feasible; <br />x It is considerably different from the alternatives or mitigation measures already evaluated in <br />the Draft EIR; <br />x It would clearly lessen the project's significant environmental impacts; and <br />x It is not adopted. <br />Recirculation is only required only if each of the above tests is met. (South County Citizens, supra at <br />330). As described in detail in the Final EIR, mitigation measures proposed during the public <br />comment period are either (1) not necessary; (2) not feasible; (3) or are already included as <br />mitigation. Minor edits were made to MM GEO-6a and MM GEO-6b to provide revised numerical <br />references for the respective impact section and did not involve any modifications to the contents of
The URL can be used to link to this page
Your browser does not support the video tag.