My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet 04222026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
04-22
>
Planning Commission Meeting Agenda Packet 04222026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:22:28 AM
Creation date
7/8/2026 11:15:26 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
593
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton <br />Hidden Canyon Residences and Preserve Project Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 9 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/MMRP/21480016 Hidden Canyon Residences and Preserve Project MMRP.docx <br />Mitigation Measures <br />Method of <br />Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />prior to initiation of demolition/construction activities during the <br />early part of breeding season (February 1 through April 30), and no <br />more than 30 days prior to initiation of these activities during the <br />latter part of the breeding season (May 1 through August 31). If <br />nesting raptors or migratory birds are detected on the project site <br />during the survey, a suitable construction-free buffer will be <br />established around all active nests. Precise dimensions of the buffer <br />(up to 250 feet) would be determined at that time and may vary <br />depending on location and species. Buffers will remain in place for <br />the duration of breeding season or until it has been confirmed by a <br />qualified Biologist that all chicks have fledged and are independent of <br />their parents. Pre-construction surveys during nonbreeding season <br />are not necessary, as birds are expected to abandon their roosts <br />during construction activities. Implementation of the above <br />measures would mitigate impacts to tree-nesting raptors and other <br />migratory birds to a less than significant level. <br />Specific East Alameda County Conservation Strategy Avoidance and <br />Minimization Measures for the golden eagle <br />Although nesting habitat is marginal on the development site and its <br />proximity, in the unlikely event that an eagle did nest on the project <br />site, the following mitigation would ensure that the project does not <br />cause nest abandonment. Pre-construction surveys for other nesting <br />birds and raptors shall include a survey for nesting golden eagles to <br />determine their presence or absence within 250 feet of the <br />development footprint. <br />xx If an active nest is identified near a proposed work area, work shall <br />be conducted outside of the nesting season (February 1 to <br />September 1). <br />xx If an active nest is identified near a proposed work area and work <br />cannot be conducted outside of the nesting season, a no-activity <br />zone shall be established by a qualified Biologist. The no-activity <br />zone will be large enough to avoid nest abandonment and at a <br />minimum will be a 250-feet radius around the nest. <br />field verification <br />and site <br />inspections, and <br />review of open <br />space preservation <br />documentation.
The URL can be used to link to this page
Your browser does not support the video tag.