My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet 04222026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
04-22
>
Planning Commission Meeting Agenda Packet 04222026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:22:28 AM
Creation date
7/8/2026 11:15:26 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
593
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton <br />Hidden Canyon Residences and Preserve Project Mitigation Monitoring and Reporting Program <br /> <br /> <br />FirstCarbon Solutions 12 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/MMRP/21480016 Hidden Canyon Residences and Preserve Project MMRP.docx <br />Mitigation Measures <br />Method of <br />Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />in the EACCS, is 3:1 within the East Bay Hills Mitigation Area, where <br />the project and <br />MM BIO-1f: Mitigation Measure for Crotch’s Bumble Bee: <br />A qualified Biologist shall conduct pre construction surveys with <br />methodology approved by the California Department of Fish and <br />Wildlife (CDFW) during the three stages of Crotch’s bumble bee flight <br />period; once a positive identification is made, no further general <br />surveys are necessary; at that point, intensive surveys would occur. <br />The three stages of flight periods include: 1) queen flight after <br />emergence is February March; 2) highest detection time for nests is <br />April–August; 3) queens solo flight is September–October when <br />queens find a hibernation area. Surveys will be conducted in the two <br />flight periods prior to the start of construction with two surveys <br />occurring at least 3 weeks apart within each of those flight periods. <br />These surveys will increase the likelihood this species and their <br />underground nests are observed will they be present on the project <br />site. Survey schedules are shown below: <br />Construction Start <br />Date <br />Required Survey <br />Periods <br />Dates of Survey <br />Periods <br />November-March 2 and 3 Two surveys April- <br />August; two surveys <br />September-October <br />April-August 3 and 1 Two surveys <br />September-October; <br />two surveys <br />February-March <br />September-October 1 and 2 Two surveys <br />February-March; <br />two surveys April- <br />August <br /> <br />City of Pleasanton <br />Community <br />Development <br />Department <br />Planning Division <br />for review and <br />approval; review of <br />documentation <br />prepared by a <br />qualified Biologist <br />and field <br />verification and site <br />inspections. <br />Prior to issuance of <br />grading or <br />construction permits <br />City of Pleasanton <br />Community <br />Development <br />Department Planning <br />Division, CDFW <br />
The URL can be used to link to this page
Your browser does not support the video tag.