My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet 04222026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
04-22
>
Planning Commission Meeting Agenda Packet 04222026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:22:28 AM
Creation date
7/8/2026 11:15:26 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
593
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton <br />Hidden Canyon Residences and Preserve Project Mitigation Monitoring and Reporting Program <br />FirstCarbon Solutions 24 <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/MMRP/21480016 Hidden Canyon Residences and Preserve Project MMRP.docx <br />Mitigation Measures <br />Method of <br />Verification Timing of Verification <br />Responsible for <br />Verification <br />Verification of Completion <br />Date Initial <br />spot-checking or suspended entirely, at the discretion of the qualified <br />professional Paleontologist and the City/Lead Agency. <br />MM GEO-6d: The Paleontological Monitor shall keep a daily log and <br />photographic record of all activities involving ground disturbance <br />during the construction phase, as well adhering to the procedures <br />outlined in the Paleontological Resource Impact Mitigation <br />Monitoring Program (PRIMMP). The Monitor’s daily activities, <br />findings, etc. shall be submitted to the Principal Paleontologist. All <br />relevant details and findings shall be summarized in a report that <br />shall be prepared at the completion of ground-disturbing activities <br />and submitted to the City/Lead Agency and UCMP repository. <br />Additionally, specimens shall be identified and curated into a <br />permanent accredited repository (such as the University of California <br />Museum of Paleontology [UCMP]) with permanent curation and <br />retrievable storage. <br />City of Pleasanton <br />Community <br />Development <br />Department <br />Planning Division <br />for review and <br />approval; review of <br />documentation <br />prepared by the <br />qualified <br />Paleontological <br />Resource Monitor <br />and Principal <br />Paleontologist, and <br />confirmation of <br />submittals. <br />During <br />ground-disturbing <br />construction <br />activities. <br />City of Pleasanton <br />Community <br />Development <br />Department Planning <br />Division; SVP- <br />qualified PRM, <br />accredited repository <br />3.8 Hazards and Hazardous Materials <br />MM HAZ-1: The applicant shall retain a licensed professional to <br />conduct asbestos and lead paint surveys. Prior to the issuance of <br />demolition permits for the two existing residences and associated <br />structures, the applicant shall demonstrate removal of any suspect <br />asbestos-containing materials and lead-based paint to the <br />satisfaction of the City. <br />City of Pleasanton <br />Community <br />Development <br />Department <br />Planning Division <br />for review and <br />approval; review of <br />documentation <br />prepared by <br />licensed <br />professionals and <br />permit verification. <br />Prior to issuance of <br />demolition permits. <br />City of Pleasanton <br />Community <br />Development <br />Department Planning <br />Division
The URL can be used to link to this page
Your browser does not support the video tag.