Laserfiche WebLink
Z <br />& <br />d <br />Z <br />& <br />d <br />P18-0078, P18-0080, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br />32 of 36 <br />c. Soil management report; <br />d. Landscape design plan; <br />e. Irrigation design plan; and <br />f. Grading design plan. <br />103. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to final <br />inspection by the Building and Safety Division, the project developer’s landscape <br />architect shall submit a Certificate of Completion Package in PDF format to the <br />Landscape Architecture Division for review and approval. The Certificate of Completion <br />Package shall include: <br />a. Project information sheet; <br />b. Certificate of installation according to the landscape documentation package; <br />c. Irrigation scheduling; <br />d. Schedule of irrigation, landscape and irrigation maintenance; <br />e. Landscape irrigation audit report; and <br />f. Soil management report (if not previously submitted). <br />104. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be <br />installed as shown on the approved building permit set and shall be inspected and <br />approved by the Landscape Architecture Division. <br />105. CONCRETE CURBS: 6-inch vertical concrete curbs, with curb cuts or flush curbs with <br />wheel stops, if determined to be acceptable by the Director of Engineering/City <br />Engineer and Director of Community Development, shall be installed between all paved <br />and landscape areas, in conformance with the City’s Standard Specifications and <br />Details. <br />106. EROSION CONTROL: For purposes of erosion control, the project developer shall plant <br />a hydro seed mixture designed by the project developer’s landscape architect and <br />approved by the Landscape Architecture Division prior to installation. The erosion <br />control shall be maintained by the project developer until permanent landscaping is in <br />place.