My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet 04222026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
04-22
>
Planning Commission Meeting Agenda Packet 04222026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:22:28 AM
Creation date
7/8/2026 11:15:26 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
593
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Z <br />& <br />d <br />Z <br />& <br />d <br />P18-0078, P18-0080, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br />35 of 36 <br />place until final landscape inspection by the Landscape Architecture Division. Removal <br />of such fencing prior to approval may result in a “stop work order.” <br />OPERATIONS SERVICES DEPARTMENT –ENVIRONMENTAL SERVICES/UTILITIES <br />DIVISION –925-931-5500 <br />117. SEWER LINE: The sewer line shall be private from the new manhole on (insert street <br />name)into the development. Prior to building permit submittal, the project plans shall be <br />revised to reflect this requirement. <br />118. BACKFLOW PREVENTION ASSEMBLIES: Backflow preventer assemblies shall be <br />designed and installed in accordance with current City Standards 704, 705, 706; State <br />Health and Safety Code; Title 17; and as required by the Director of Operations and <br />Water Utilities. All backflow preventer assemblies shall be tested and certified by a City <br />approved tester with the certification submitted to the City’s contractor, Aqua Backflow. <br />Testing will be performed at the time City water is turned on to the site. If an existing <br />backflow preventer is on the site it shall be tested and certified by an approved tester <br />with the certification submitted to the City’s contractor, Aqua Backflow, before project <br />water is drawn through it. An all-weather cover shall be placed over all backflow <br />prevention assemblies 4 inch and smaller. <br />119. RECYCLED WATER: Recycled water should be used on site during the grading and <br />construction period. However, under any declared stage of water shortage, recycled <br />water must be used throughout the grading and construction period. <br />TRAFFIC ENGINEERING DIVISION –925-931-5677 <br />Traffic Control <br />120. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall <br />be submitted to the City Traffic Engineer for review and approval. Best management <br />practices to minimize traffic impacts shall be used during construction, including <br />scheduling of major truck trips and deliveries, to avoid peak travel hours. The TCP shall <br />have proper lane closure procedures such as flagger stations, signage, cones, and <br />other warning devices implemented during construction. The TCP shall also include <br />time of day/hours of lane closures and total number of days. <br />121. TRUCK ROUTES: The haul route for all materials to and from the project site shall be <br />reviewed and approved by the City Traffic Engineer prior to building permit issuance <br />and shall include the provision to monitor the street surfaces used for the haul route so
The URL can be used to link to this page
Your browser does not support the video tag.