Laserfiche WebLink
DRA <br />F <br />T <br /> <br /> <br /> <br /> <br />P18-0078, P18-0080, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />12 of 36 <br /> <br />costs associated with implementation, monitoring, and reporting. The developer shall <br />create and provide a mitigation measures checklist indicating all mitigation measures <br />have been satisfied, incorporated into the building permit plans or improvements plans, <br />and/or addressed. Said checklist shall be incorporated as one of the first four plan <br />sheets of all building permit and engineering permit plan submittals for review by the <br />City prior to issuance of permits Compliance shall be verified by the City prior to <br />issuance of applicable permits and throughout construction and operation, as specified. <br />Project Specific Condition. <br /> <br />Green Building and Sustainability Measures <br /> <br />25. Climate Action Plan 2.0 Compliance: Prior to building permit issuance, a Greenhouse <br />Gas (GHG) Emission Compliance Checklist shall be provided, to the Planning Division <br />for review and approval by the Director of Community and Economic Development. The <br />measures shall be shown on the building permit plans submitted to the Building and <br />Safety Division. The Checklist shall include notation indicating the sheet(s) the measure <br />can be found. Prior to building permit final, all of the measures indicated on the <br />approved checklist shall be inspected and approved by the City of Pleasanton. <br /> <br />Construction Practices and Noticing <br /> <br />26. WORK HOURS: All demolition and construction activities, inspections, plan checking, <br />material delivery, staff assignment or coordination, etc., shall be limited to the hours of <br />8 a.m. to 5 p.m., Monday through Saturday. No construction shall be allowed on S tate <br />or Federal Holidays or Sundays. The Director of Community and Economic <br />Development may allow earlier “start times” or later “stop times” for specific construction <br />activities, e.g., concrete pouring. All construction equipment shall meet Department of <br />Motor Vehicles (DMV) noise standards and shall be equipped with muffling devices. <br />Prior to construction, the hours of construction shall be posted on site. <br /> <br />27. OVERNIGHT CONSTRUCTION PARKING: Campers, trailers, motor homes, or any <br />other similar vehicle are not allowed on the construction site except when needed as <br />sleeping quarters for a security guard subject to receipt of a temporary conditional use <br />permit (per PMC § 18.116.010.E). <br /> <br />28. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on <br />the project site for daily administration/coordination purposes during the construction <br />period. <br /> <br />29. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The project developer shall <br />prepare a construction and parking management plan to address impacts and parking <br />demands during the construction phase of the project. The construction and parking <br />management plan shall be subject to review and approval by the City Traffic Engineer <br />and Director of Community and Economic Development prior to issuance of a