Laserfiche WebLink
DRA <br />F <br />T <br /> <br /> <br /> <br /> <br />P18-0078, P18-0080, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />15 of 36 <br /> <br />40. RECORDED DISCLOSURES: All lots covered by this approval shall include separately <br />recorded disclosure statements or restrictive covenants indicating the following: <br /> <br />a. Except for Junior/Accessory Dwelling Units (ADUs), additions and/or <br />modifications to the structures and garages for Lots 1-28 are prohibited. <br /> <br />b. Residents, tenants, guests, etc., are prohibited from parking on the driveway <br />apron. <br /> <br />c. Boats, trailers, campers, motor homes, and other recreational vehicles are not <br />allowed to be parked or stored on site. <br /> <br />d. The garages for Lots 1-30 shall not be modified or used for storage in a <br />manner that would interfere with the ability to park two cars within the garages <br />of the units and each resident shall utilize the garages for parking of vehicles <br />only. <br /> <br />Wording for these disclosures and covenants shall be written in simple/plain language, <br />shall be submitted to the Community and Economic Development Director and the City <br />Attorney for review and approval prior to recordation of the final map, and shall be <br />recorded over the project site by separate instrument. <br /> <br />41. CONDITIONS OF APPROVAL: The project developer shall provide all initial buyers with <br />copies of the final project conditions of approval. <br /> <br />BUILDING AND SAFETY DIVISION – 925-931-5300 <br /> <br />42. PHASED OCCUPANCY: If building occupancy is proposed to be phased, the project <br />developer shall submit a phasing plan to the Chief Building and Safety Official for review <br />and approval. <br /> <br />43. BUILDING SURVEY: The project developer shall submit a building survey and/or record <br />of survey and a site development plan in accordance with the provisions of Chapter <br />18.68 of the PMC. These plans shall be approved by the Chief Building Official prior to <br />building permit issuance. The site development plan shall include all required <br />information to design and construct site, grading, paving, drainage, and utilities. <br /> <br />44. PAD AND SETBACK CERTIFICATION: The project developer shall submit a pad <br />elevation certification prepared by a California licensed land surveyor or registered civil <br />engineer to the Chief Building Official and Director of Community and Economic <br />Development certifying the pad elevations and building locations (setbacks) are <br />conforming to the approved plans, prior to receiving a foundation inspection for the <br />structures. <br /> <br />