My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Supplemental Materials 04222026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
04-22
>
Planning Commission Meeting Supplemental Materials 04222026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:26:29 AM
Creation date
7/8/2026 11:26:08 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRA <br />F <br />T <br /> <br /> <br /> <br /> <br />P18-0078, P18-0080, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />27 of 36 <br /> <br /> <br />79.78. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the <br />project shall pollutants be allowed to enter, clog, or contaminate storm drain pipe <br />networks or open stormwater channels in violation of Pleasanton Municipal Code §§ <br />9.14.080, et seq. The project developer shall contain all trash and debris for proper <br />disposal to authorized landfills or recyclers. Erosion control features shall be deployed <br />during the rainy season that extends from October 1 st to April 15th each year, or any <br />time rain is forecast outside of this period. Best Management Practices (BMPs) shall be <br />strictly followed. Street sweepers must be employed if soil or debris is tracked onto the <br />public roads from vehicles exiting the site. Standard BMPs are available from the <br />California Stormwater Quality Association (CASQA), the United States Environmental <br />Protection Agency (EPA), Caltrans, and others. Notes and/or illustrations shall be added <br />to the plans that describe the BMPs to be utilized during construction. The use of <br />manufactured erosion control woven blankets and straw wattles that utilize plastic <br />monofilament netting is specifically prohibited. (Address this condition during <br />construction). <br /> <br />80.79. SWPPP REPORTING: Copies of any monitoring and/or sampling reports required by <br />the stormwater pollution prevention plan (SWPPP) and submitted by the Legally <br />Responsible Person (LRP) to the State of California’s SMARTS database shall also be <br />submitted to the City of Pleasanton inspector assigned to the project. The LRP shall <br />also submit to the City a copy of the required Annual Report no later than September <br />1st of each year that construction is active or when erosion control features have been <br />deployed. The report must include a summary of all sampling and analysis performed <br />(Risk Levels 2 and 3 only), a log of all inspections performed including Rain Event <br />Action Plans (REAP), a summary of any required corrective actions taken, and a <br />summary of any violations. (Address this condition during construction). <br /> <br />81.80. DUST CONTROL: Dust control measures must be employed during all phases of <br />construction to prevent airborne nuisance to neighboring properties. All stockpiles or <br />unused materials that can create dust shall be covered or removed. Exposed soil areas <br />shall be routinely watered until surfacing materials or landscaping is installed. Use of <br />dust palliatives shall conform to Caltrans Standard Specification Section 18. Any <br />damage caused by airborne dust to neighboring properties shall be cleaned with costs <br />paid by the project developer. If the project developer fails the address dust as directed <br />by the City, the City shall have the right to enter the property to effectuate the <br />correction, with all costs paid by the project developer or levied as a lien against the <br />project developer’s property. (Address this condition during construction) <br /> <br />82.81. PROPERTY NUISANCE: At no time during construction of the project shall the <br />condition of the property become a nuisance as defined in Pleasanton Municipal Code § <br />9.28.020. The City shall have the right to inspect the property for conditions that violate
The URL can be used to link to this page
Your browser does not support the video tag.