Laserfiche WebLink
DRA <br />F <br />T <br /> <br /> <br /> <br /> <br />P18-0078, P18-0080, P18-0081, PUD-130, and Tract 8569 PC-2026-09, April 22, 2026 <br /> <br />27 of 36 <br /> <br /> <br />79.78. POLLUTANT REDUCTION IN STORMWATER: At no time during construction of the <br />project shall pollutants be allowed to enter, clog, or contaminate storm drain pipe <br />networks or open stormwater channels in violation of Pleasanton Municipal Code §§ <br />9.14.080, et seq. The project developer shall contain all trash and debris for proper <br />disposal to authorized landfills or recyclers. Erosion control features shall be deployed <br />during the rainy season that extends from October 1 st to April 15th each year, or any <br />time rain is forecast outside of this period. Best Management Practices (BMPs) shall be <br />strictly followed. Street sweepers must be employed if soil or debris is tracked onto the <br />public roads from vehicles exiting the site. Standard BMPs are available from the <br />California Stormwater Quality Association (CASQA), the United States Environmental <br />Protection Agency (EPA), Caltrans, and others. Notes and/or illustrations shall be added <br />to the plans that describe the BMPs to be utilized during construction. The use of <br />manufactured erosion control woven blankets and straw wattles that utilize plastic <br />monofilament netting is specifically prohibited. (Address this condition during <br />construction). <br /> <br />80.79. SWPPP REPORTING: Copies of any monitoring and/or sampling reports required by <br />the stormwater pollution prevention plan (SWPPP) and submitted by the Legally <br />Responsible Person (LRP) to the State of California’s SMARTS database shall also be <br />submitted to the City of Pleasanton inspector assigned to the project. The LRP shall <br />also submit to the City a copy of the required Annual Report no later than September <br />1st of each year that construction is active or when erosion control features have been <br />deployed. The report must include a summary of all sampling and analysis performed <br />(Risk Levels 2 and 3 only), a log of all inspections performed including Rain Event <br />Action Plans (REAP), a summary of any required corrective actions taken, and a <br />summary of any violations. (Address this condition during construction). <br /> <br />81.80. DUST CONTROL: Dust control measures must be employed during all phases of <br />construction to prevent airborne nuisance to neighboring properties. All stockpiles or <br />unused materials that can create dust shall be covered or removed. Exposed soil areas <br />shall be routinely watered until surfacing materials or landscaping is installed. Use of <br />dust palliatives shall conform to Caltrans Standard Specification Section 18. Any <br />damage caused by airborne dust to neighboring properties shall be cleaned with costs <br />paid by the project developer. If the project developer fails the address dust as directed <br />by the City, the City shall have the right to enter the property to effectuate the <br />correction, with all costs paid by the project developer or levied as a lien against the <br />project developer’s property. (Address this condition during construction) <br /> <br />82.81. PROPERTY NUISANCE: At no time during construction of the project shall the <br />condition of the property become a nuisance as defined in Pleasanton Municipal Code § <br />9.28.020. The City shall have the right to inspect the property for conditions that violate