My WebLink
|
Help
|
About
|
Sign Out
Planning Commission Meeting Agenda Packet 05132026
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2026
>
05-13
>
Planning Commission Meeting Agenda Packet 05132026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2026 11:54:19 AM
Creation date
7/8/2026 11:49:55 AM
Metadata
Fields
Template:
CITY CLERK
DOCUMENT DATE
5/13/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From:Natalie Amos <br />To:Craig <br />Cc:Ekaterina <br />Subject:RE: Comments on Application P26-0136, 2986 Liberty Drive <br />Date:Monday, March 16, 2026 3:55:00 PM <br />Attachments:image001.png <br />image002.png <br />image003.png <br />image004.png <br />image005.png <br />Good afternoon Craig, <br />Thank you for your email and for taking the time to provide comments regarding the proposed project <br />at 2986 Liberty Drive. Your communication has been provided to the Zoning Administrator and will be <br />included in the project record. <br />Regarding views, the City of Pleasanton does not have view or sky easements between private <br />properties. Any such easements would typically be private agreements recorded on a property’s title, <br />if they exist. <br />As you noted, the Planning Division does not oversee and/or enforce Building or Fire Code <br />requirements. Additionally, the Planning Division does not require or approve construction drawings, <br />as our review is limited to applicable Planning standards. The plans submitted for Planning review are <br />used to evaluate compliance with items such as setbacks, building height, building separation, floor <br />area ratio, and other applicable Planning requirements. Detailed construction drawings are prepared <br />and submitted later as part of the Building and Safety Divisions construction permit process, after a <br />project has received a Planning entitlement. The construction permit process has different submittal <br />requirements and is overseen by the City’s Building and Safety Division. <br />It is the responsibility of the property owner and their design professionals to ensure all applicable <br />Building and Fire Code requirements are identified and addressed as part of the construction permit <br />process and to conduct their due diligence regarding the potential costs associated with <br />construction. <br />For projects such as this, Planning approval is required prior to Building’s permit process, and all <br />active Building and Fire Codes in effect at the time of Building Permit submittal will be applied during <br />plan check by the City’s Building and Safety Division and Fire Department staff. Building permits for <br />projects of this nature are often submitted one to three years after Planning approval, at which time <br />the applicable codes and requirements will be reviewed and enforced by those divisions. <br />If you would like confirmation or clarification regarding your interpretations of Building or Fire Code <br />requirements, I would encourage you to share your email with the City’s Chief Building Official and <br />Fire Marshal, as they are the appropriate staff to have that dialogue with directly to address those <br />matters. Additionally, I would also encourage you to share your concerns regarding potential <br />construction costs or requirements associated with the project directly with the property owner, so
The URL can be used to link to this page
Your browser does not support the video tag.