Laserfiche WebLink
P25-0116. P25-0116, P25-0018, PUD-154 and Tract 8123 (Arroyo Lago) Planning Commission <br />14 of 22 <br />with all-electric residential unit requirements, nor does it incorporate a battery storage backup <br />system for the units. Under legal rulings issued since the CAP’s adoption, the City can no <br />longer impose an all-electric residential unit requirement. With regard to the battery storage <br />backup system, the applicant has indicated that it would prefer this be a buyer’s purchase <br />option. As this is an enforceable CAP requirement, the construction plans shall include this <br />item. A condition of approval addresses the backup system requirement. <br /> <br />Planning Unit Development (PUD) <br />As specified in PMC Chapter 18.68, a PUD development plan allows flexibility in applying <br />Municipal Code standards to achieve an innovative overall plan for project sites and the area. <br />The applicant developed the current site plan, which reflects prior direction from the City <br />Council and incorporates staff comments through numerous discussions. <br /> <br />The Project is similar to the residential development approved in the County, with certain <br />changes, including modifications to the grading plan facilitated by the ability to connect to City <br />utilities, which would be an improvement over the County project . Staff finds that the proposed <br />siting, massing, and lot and unit sizes are appropriate for this site and would result in an <br />attractive development for this area. The buildings would be in keeping with the scale and <br />massing of the surrounding homes, specifically the recently approved Villages at the Quarry <br />residential development across the street. As noted, the single-story home design and <br />proposed grading plan would reduce impacts and improve compatibility with the adjacent <br />Village at Ironwood development to the west. Further the PUD supports the annexation and <br />extension of public services to the site in a logical and orderly manner , by providing flexibility in <br />certain development standards that allow the project to remain feasible to develop. <br /> <br />Site Layout <br />The site layout provides building setbacks compatible with the nearby residential development. <br />The proposed driveway depth of 18 feet is shorter than the more typically required 23 feet. As <br />the intent of a PUD development is to allow flexibility in development standards, and the <br />applicant stated this driveway depth is sufficient to accommodate parking of a regular-sized <br />vehicle, while accommodating other site planning features such as appropriate sidewalk <br />widths, landscaping, travel lanes, and on-street parking, staff finds the proposed setbacks to <br />be acceptable as proposed. <br /> <br />The site layout shows the centrally located park, and the internal roadway network is <br />geometrically designed with straight roadways. All streets, except for the east side of Street C, <br />have separated sidewalks. Speed lumps have been proposed for north/south streets to serve <br />as traffic-calming measures and to deter speeding. <br /> <br />Architecture and Design <br />The proposed residential architecture is designed to reflect a California community, featuring <br />Farmhouse, Craftsman, Modern Ranch, and Prairie styles. Homes would feature varied <br />architectural styles, materials, detailing, and overall elevations to create visual interest and <br />avoid uniformity. <br /> <br />The scale and mass of homes have been carefully considered. Specifically, the homes along <br />the westerly property line would be one-story with a 15-foot rear-yard setback so that the new <br />homes would not appear to loom over the existing one -story homes to the immediate west. <br />Additionally, the 15-foot rear yard setback would provide an adequate buffer between homes.