Laserfiche WebLink
<br /> <br />448684.1 <br />1” 25 17.6 Q3 (17.6 gpm) is equivalent to <br />maximum continuous flow per <br />ISO 4064 §4.1 and the meter <br />manufacturer; satisfies Zone 7 <br />requirement <br /> <br /> <br />The City therefore concludes that the proposed FLOWIQ® 2200 meters satisfy the applicable <br />flow capacity requirements in Zone 7’s Connection Fee Schedule and meet the hydraulic <br />equivalency requirement of the Settlement Agreement dated July 17, 2025. <br /> <br /> <br /> <br /> <br />Siew-Chin Yeong, P.E. <br />Director of Public Works <br /> <br /> <br /> <br /> <br />Encl: 2026.06.26 Kamstrup Letter_Max Continuous Flow Confirmation <br /> <br /> <br />Cc: Joe Calabrigo, Interim City Manager <br /> Alexa Jeffress, Assistant City Manager <br /> Chris Hentz, Assistant General Manager