My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET 7-21-26
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2026
>
072126 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET 7-21-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2026 11:36:47 AM
Creation date
7/16/2026 11:22:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/21/2026
DESTRUCT DATE
15Y
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
928
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />RESOLUTION NO. 26-X <br /> <br />A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PLEASANTON <br />APPROVING THE DIRECTOR OF PUBLIC WORKS OR DESIGNEE TO APPLY FOR <br />CALIFORNIA STATE WATER RESOURCES CONTROL BOARD FUNDS FOR THE <br />GROUNDWATER SUPPLY PROJECT <br /> <br /> <br />WHEREAS, historically, the City’s groundwater production quota of 3,500 acre-feet per <br />year has supplied 20 to 30 percent of the City of Pleasanton’s annual water demand; and <br /> <br />WHEREAS, in 2019 and 2022, the City’s groundwater wells were placed out of service <br />after per- and polyfluoroalkyl substances (PFAS) were detected above advisory levels; and <br /> <br />WHEREAS, in October 2023, the City completed the Water Supply Alternatives Study that <br />assessed multiple strategies to regain the use of City’s groundwater production quota and <br />recommended to pursue development of new groundwater wells in the Bernal groundwater <br />subbasin through establishment of the Groundwater Supply Project; and <br /> <br />WHEREAS, in April 2026, the City Council approved moving forward with the <br />implementation of the Groundwater Supply Project in partnership with Zone 7; and <br /> <br />WHEREAS, the Groundwater Supply Project will also require improvements to the City’s <br />water distribution system that are the sole responsibility of the City; and <br /> <br />WHEREAS, the estimated cost of the Groundwater Supply Project, including the City’s <br />share of the groundwater supply improvements to be jointly constructed with Zone 7 and the City’s <br />sole cost for distribution improvements, is estimated at approximately $27.5 million in 2026 <br />dollars; and <br /> <br />WHEREAS, the City desires and intends to apply for financing and/or financial assistance <br />related to the Groundwater Supply Project from the California State Water Resources Control <br />Board (SWRCB). <br /> <br />NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF PLEASANTON DOES <br />RESOLVE, DECLARE, DETERMINE AND ORDER THE FOLLOWING: <br /> <br />SECTION 1. The Director of Public Works (the “Authorized Representative”) or designee <br />is hereby authorized and directed to sign and file, for and on behalf of the Entity, a Financial <br />Assistance Application for a financing agreement with the State Water Resources Control Board <br />for the planning, design, and construction of the Groundwater Supply Project. <br /> <br />SECTION 2. The Authorized Representative, or his/her designee, is designated to <br />provide for assurance, certifications, and commitments required for the financial assistance <br />application, including executing a financial assistance agreement from the State Water Resources <br />Control Board and any amendments or changes thereto. <br /> <br />SECTION 3. The Authorized Representative, or his/her designee, is designated to <br />represent the City in carrying out the City's responsibilities under the financing agreement, <br />including certifying disbursement requests on behalf of the City and compliance with applicable <br />state and federal laws. <br /> <br />Page 98 of 923
The URL can be used to link to this page
Your browser does not support the video tag.