Laserfiche WebLink
City of Pleasanton <br />Sewer Rate Study Report <br /> <br />Water Resources Economics <br />1 <br />1. EXECUTIVE SUMMARY <br />1.1 SYSTEM OVERVIEW <br />The City of Pleasanton (City) provides sewer collection services to over 21,000 Residential, <br />Commercial, Industrial, and Institutional service connections. The City’s service area is in the <br />Amador Valley and is a suburb in the East Bay region of the San Francisco Bay Area, <br />encompassing approximately 25 square miles. <br /> <br />The sewer collection system, which is owned and operated by the City, consists of 8 siphons, 11 <br />lift stations, 6,500 manholes, 4.9 miles of force mains, and 260 miles of gravity pipelines to <br />collect and transport wastewater to regional treatment facilities. The City’s wastewater is <br />transported to Dublin San Ramon Services District (DSRSD) Regional Wastewater Treatment <br />Facility, except for wastewater from Ruby Hill area which is sent to the City of Livermore’s Water <br />Reclamation Plant. The City also has agreements with Alameda County that allow wastewater <br />flows from the Castlewood Service Area to be transported though the City’s collection system for <br />DSRSD treatment. <br /> <br />Sewer charges and fees for each customer include both local sewer collection and regional <br />wastewater treatment components. The City sets local collection charges and fees, while <br />regional treatment charges and fees are set by DSRSD and the City of Livermore and are passed <br />through directly to the City’s customers. This study will only evaluate the City’s local sewer <br />collection charges and fees. <br /> <br />1.2 RATE STUDY OVERVIEW <br />Public retail utility agencies in California typically conduct a cost-of-service study every five years <br />to ensure that customers are appropriately charged for sewer service and to reestablish the cost- <br />of-service nexus that is required by Proposition 218. The City’s existing sewer rate structure was <br />developed in 2022, and the City has historically only adjusted rates annually based on CPI <br />(Consumer Price Index) to keep pace with inflation and routine O&M (Operations & Maintenance) <br />changes. In 2025, the City updated its Sewer System Management Plan (SSMP), with the latest <br />revision in 2026, and adopted a Long-Term Sewer Capital Improvement Plan (CIP) to be reviewed <br />every two years and updated every six years. These documents identify capital improvement, <br />operation, and maintenance needs over the next 20 years and serve as the foundation for future <br />rate-setting and financial planning. <br /> <br />The City engaged Water Resources Economics, LLC (WRE) in 2025 to conduct a comprehensive <br />sewer rate study, with the following objectives: <br />Page 153 of 923