Laserfiche WebLink
City of Pleasanton <br />Sewer Rate Study Report <br /> <br />Water Resources Economics <br />5 <br />by the City’s financial performance, input from City staff, and feedback and direction from City <br />Council. <br /> <br />FACTORS AFFECTING FINANCIAL PERFORMANCE <br />The sewer system’s financial performance is driven by the ability of the current sewer rates to <br />meet the City’s funding needs. To maintain financial sufficiency, sewer rates must fully fund O&M <br />costs, CIP expenditures based on the City’s SSMP, and any relevant financial policies, which <br />typically include reserve policy targets and debt coverage requirements. <br /> <br />The key factors affecting financial performance include: <br />• Substantial capital investment needs over the next four years: The cost of planned CIP <br />expenditures from FY 2026 through FY 2030 totals approximately $39.3 million (M). Of the <br />total cost of planned CIP expenditure, $28.0M will be funded with new debt. This CIP <br />funding plan was designed to address high priority infrastructure needs while phasing <br />other improvements over time to responsibly manage costs and long-term system risks. <br />The major projects include pipe bridge and siphon improvements as well as lift station, <br />generator, and pipeline replacements intended to meet current sanitary sewer system <br />regulatory requirements outlined by the State Water Resources Control Board (SWRCB) <br />and City Council-approved SSMP on sewer inspection, maintenance, cleaning, repair, and <br />replacement. <br />• New O&M expenses and cost increases: Implementation of the City’s planned CIP <br />requires new O&M expenses, programs, and additional staffing costs in accordance with <br />the City’s SSMP, totaling approximately $15.3M over the four-year rate setting period. <br />Additionally, the City’s existing O&M fund base expenses are projected to increase by 3.6% <br />on average over the four-year rate setting period due to inflationary pressures. Based on <br />current rates and projected expenses, the City is not expected to cover its existing O&M <br />expenses in FY 2026. <br />• Debt coverage requirements: The City plans to issue approximately $28.6M in new debt <br />to fund CIP. Annual debt service payments relating to new debt for CIP fluctuate between <br />$444.8 thousand (K) in FY 2028 and $2.1M in FY 2030. The City must maintain a debt <br />coverage ratio of 125% to meet proposed debt coverage requirements 3. This means that <br />the City’s net operating revenues (excluding CIP funding sources and expenditure) must be <br />at least 125% greater than proposed annual debt service in each year. <br />• Reserve policy targets: The City’s current operating reserve policy, which is shown in <br />Table 1-2, allows the City to maintain cash on hand to meet short-term cash flow <br />requirements. Sewer utility operations are organized amongst several funds; however, this <br />study focuses on the unrestricted Sewer O&M Fund (Fund 430), Sewer Replacement Fund <br />(Fund 434), and Sewer CIP Fund (Fund 431). The operating reserve policy only applies to <br /> <br />3 Debt coverage is calculated for the entire sewer utility (O&M, Replacement and CIP funds combined). <br />Page 157 of 923