My WebLink
|
Help
|
About
|
Sign Out
BSK ASSOCIATES - FIRST AMENDMENT (#2024173)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
B
>
BSK ASSOCIATES - FIRST AMENDMENT (#2024173)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 10:58:05 AM
Creation date
7/20/2026 10:55:25 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Design Professionals
Contract Type
Amendment
NAME
BSK ASSOCIATES (FIRST AMENDMENT)
Contract Record Series
704-05
Munis Contract #
2024173
Contract Expiration
6/30/2027
NOTES
GEOTECHNICAL ENGINEERING AND MATERIAL TESTING SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BSK Associates - July 1, 2026 - June 30, 2027 Schedule of Fees (Prevailing Wage) <br />PROFESSIONAL STAFF TECHNICAL STAFF (Prevailing Wage) <br />Principal 289.71$ <br />Senior Professional 247.04$ Group 1 - Special Inspector 205.68$ <br />Project Professional II 206.89$ Group 2 - Special Inspector 198.67$ <br />Project Professional I 154.18$ Group 3 - Engineering Technician 273.75$ <br />Staff Professional II 127.62$ Group 4 - Technician 152.20$ <br />Staff Professional I 104.51$ Courier 67.97$ <br />Project Administrator 112.08$ Administrative Assistant 80.84$ <br />REIMBURSABLES BASIS OF CHARGES FOR FIELD TECHNICIAN SERVICES <br />Mileage (Portal to Portal)IRS Rate Field Work from 0 to 4 hours Bill 4 hours <br />Per Diem (as required)218.65$ Field Work from 4 to 8 hours Bill 8 hours <br />Bridge Toll Cost + 15%Field Work over 8 hours / Saturdays Bill time and a half <br />Parking Fees Cost + 15%Sundays, holidays and over 12 hours Bill double time <br />Subconsultant Services Cost + 15%Second/Special/Multi-Shift Base Rate x 12.5% <br />Project Setup (Project)$546.64 Sampling or cylinder pickup, minimum charge Bill 2 hours <br />Show-up time (no work performed)Bill 2 hours <br />ANALYSIS SOFTWARE USAGE FEES EQUIPMENT <br />gINT (Project)65.00$ Nuclear Gauge (Day)71.00$ <br />LPile (Project)65.00$ Ultrasonic Weld Equipment (Day)71.00$ <br />APile (Project)65.00$ Torque Wrench (Day)71.00$ <br />SHAFT (Project)65.00$ Proof Load Equipment (Day)71.00$ <br />GROUP (Project)128.00$ Rebar Locator / Pachometer 129.00$ <br />Cliq (Project)65.00$ Hand Auger (Day)258.00$ <br />LiquefyPro (Project)65.00$ Water Meter (Day)65.00$ <br />LiqIT (Project)56.00$ Drilling Kit - Paint, stakes and lath - (Project)33.00$ <br />NovoLIQ (Project)65.00$ Drilling Supplies - Reuse of tubes/caps (Project)323.00$ <br />Slide (Project)128.00$ Manometer (Day)253.00$ <br />Settle3D (Project)128.00$ Double Ring Infiltrometer (Day)642.00$ <br />ArcGIS (Project)65.00$ DIR/PREVAILING WAGE ADMINISTRATION FEES (MONTHLY) <br />EZ-FRISK (Per Project Site/Site Class)611.00$ Certified Payroll / DIR Upload 301.00$ <br />Non-Performance Certified Payroll / DIR Upload 100.00$ <br />Subcontractor Management / Compliance Forms 100.00$ <br />Additional LCP Tracker or Other Compliance Software 201.00$ <br />Additional Special Forms as required -$ <br />Moisture Density Curves California Bearing Ratio (CBR) <br />Standard Proctor, 4" (ASTM/AASHTO)298.00$ CBR at 100% (ASTM D1883 or AASHTO T-180)649.00$ <br />Modified Proctor, 4" Mold (ASTM/AASHTO)298.00$ CBR at 95% (ASTM D1883 or AASHTO T-180)1,258.00$ <br />Modified Proctor, 6" mold (ASTM D1557)317.00$ <br />Caltrans Maximum Wet Density (CT 216)272.00$ Permeability Tests <br />Check Point 173.00$ Rigid Wall Permeability (ASTM D2434)357.00$ <br />Flexible Wall Permeability (ASTM D5084)557.00$ <br />Particle Size Analysis Remolded Flexwall Perm (ASTM D5084)707.00$ <br />Sieve Analysis w/ Wash (ASTM D422)217.00$ <br />Minus #200 Wash, Soil (ASTM D1140)106.00$ Soil Corrosivity Tests <br />Hydrometer Analysis (ASTM D422)284.00$ Minimum Resistivity of Soils (CT 643)179.00$ <br />Double Hydrometer (ASTM D4221)396.00$ pH 83.00$ <br />Specific Gravity of Soil (ASTM D854)203.00$ Soluble Sulfate, Chloride and Sulfide 164.00$ <br />Visual Classification (ASTM D2488)54.00$ Oxidation Reduction of Soil 59.00$ <br />Sand Equivalent (ASTM D2419)159.00$ <br />% Organics in Soil (ASTM D2974)174.00$ Soil Cement Tests <br />Freeze Thaw Abrasion (ASTM D560)794.00$ <br />Atterberg Limits / Swell Tests Wetting-Drying Abrasion (ASTM D559)753.00$ <br />Plasticity Index (ASTM D4318)278.00$ Preparation of Freeze-Thaw or Wetting-Drying Tests 953.00$ <br />Shrinkage Limits of Soils (ASTM D427)259.00$ Soil Cement Compression (ASTM D1633)306.00$ <br />Expansion Index of Soils (UBC No. 29)298.00$ <br />Moisture Density Test Other <br />Tube Density 63.00$ Sand Density Calibration (ASTM D1566)118.00$ <br />Moisture Content of Soils (ASTM D2216)54.00$ <br />Unconfined Compression <br />"R" Value Determination Unconfined Compression (ASTM D2166)159.00$ <br />R-Value of Soils (CT 301)504.00$ <br />R-Value of Treated Materials (CT 301))557.00$ Shear Tests <br />Direct Shear, Undisturbed (ASTM D3080)278.00$ <br />Consolidation Tests Direct Shear, Remolded (ASTM D3080)332.00$ <br />Consolidation (ASTM D2435)531.00$ Triaxial Compression Testing QUOTE <br />Consolidation , Extra Points (ASTM D2435)71.00$ <br />Collapse Potential of Soils (ASTM D2435)259.00$ <br />Remolded Consolidation (ASTM D2435)449.00$ <br />One-Dimen Swell of Soil (ASTM D4546)164.00$ <br />PERSONNEL RATES <br />MATERIALS LABORATORY TESTS <br />SOILS <br />Page 1 of 2 <br />Exhibit ADocusign Envelope ID: A642989E-7648-8653-8018-4EC62DC3E494
The URL can be used to link to this page
Your browser does not support the video tag.