My WebLink
|
Help
|
About
|
Sign Out
INTERACTIVE RESOURCES, INC. (#2024127)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
I
>
INTERACTIVE RESOURCES, INC. (#2024127)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 12:06:44 PM
Creation date
7/20/2026 12:04:41 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Design Professionals
Contract Type
Amendment
NAME
INTERACTIVE RESOURCES, INC. (FIRST AMENDMENT)
Contract Record Series
704-05
Munis Contract #
2024127
Contract Expiration
6/30/2027
NOTES
GENERAL ARCHITECTURAL SERRVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Rate Escalation per Design Professional Services Agreement 2024065 <br /> <br />Project Title: Pleasanton OSC Fleet EV Charging Phase 1 (EV Charging Study and PG&E <br />Application Support) <br />IR Project No: P2025-045-01 <br />Project Address: 3333 Busch Road & 200 Old Bernal Street, Pleasanton CA <br />Date: June 30, 2026 <br />Client: Gerry Parco, P.E., Senior Civil Engineer - CIP Manager <br />Public Works Department, Engineering Division <br />D: (925) 931-5676 <br />gparco@cityofpleasantonca.gov <br />City of Pleasanton 200 Old Bernal Ave., Pleasanton, CA 94566 <br /> <br />Staff Classification FY24-25 (Current Rate) FY26-27 +0.3% <br />President/Principal $264 $265 <br />Managing Principal/Sr. PM/Architect $240 $241 <br />Principal/Sr. PM/Architect $228 $229 <br />Principal/Sr. PM/Structural Eng. $228 $229 <br />Project Manager/Architect $216 $217 <br />Senior Designer/Drafter $190 $191 <br />Designer/Drafter $154 $155 <br />Technical Support $147 $148 <br /> <br />Note, IR may opt to utilize the FY24-25 billing rate simply due to cost of implementation and reserve the right to <br />convert to the newer agreed rate table if and when an hourly threshold is reached. <br />Endnotes <br />1. Source data: CA DGS CCCI table (ENR BCI, SF+LA average), retrieved June 2026. May values: <br />2023=9,621; 2024=9,655; 2025=10,192; 2026=10,188. <br />2. FY24-25 through FY26-27 escalation applied May-to-May per Agreement Section 5 using published <br />CCCI data. <br />3. FY27-28 projection basis: SF Bay Area CPI-U for 12 months ending April 2026 = 3.8% (BLS). May <br />2026 to May 2027 ENR BCI is not yet published; SF Bay Area CPI-U used as the regional proxy <br />consistent with the geographic intent of the Agreement's escalation clause. National headline CPI of <br />4.2% was considered but excluded; elevated by energy cost volatility attributable to the 2026 Middle <br />East conflict, which is not construction-labor-representative. <br />4. FY27-28 column is a projection only. Actual adjustment must be calculated from May 2027 ENR BCI <br />when published and submitted to the City prior to June 30, 2027 per Agreement Section 5. <br />5. All rates rounded up to the nearest whole dollar <br />;xhibitpz <br />Docusign Envelope ID: 8F427FCA-05CE-8E26-807E-8270FCE1E507
The URL can be used to link to this page
Your browser does not support the video tag.