Laserfiche WebLink
e5l KIER+WRIGHT <br />All blueprinting and reproduction will be billed at cost plus 10%. <br />Time spent for preparation for testimony will be billed in accordance With the above hourly rates. <br />The above rates include all applicable fringe, overhead and profit calculations. No additional percentages for <br />overhead, profit, or any other costs related to labor will be charged. Rates are current for Fiscal Year 2023-24 <br />7/1/2o23- 6/30/2024). The City will consider annual adjustments based on CPI(Consumer Price Index, May of <br />applicable years)and submitted prior to the end of the fiscal year for approval based on ENR Construction Index <br />for San Francisco and Bay Area. <br />Subcontractor Markup shall not exceed 15% <br />Expenses:Reimbursable expenses are in addition to the agreed hourly fees and include actual expenditures made <br />by the consultant in the interest of the project. Eligible reimbursable expenses shall be billed at cost with a 10 <br />percent markup. Reimbursable expenses include such items as postage, reproduction, drawing plotting,printing, <br />special materials, or equipment for project deliverable to the City. Consultant's printing and reprographics for <br />internal uses are excluded. <br />Mileage and Equipment charges are included in the field service <br />Central California Rates I CONFIDENTIAL www.KierWright.com <br />Docusign Envelope ID: 2A174EEF-42C9-8408-8374-81A80385ED4F