My WebLink
|
Help
|
About
|
Sign Out
MUNCICIPAL & INDUSTRIAL WATER SUPPLY
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
MUNCICIPAL & INDUSTRIAL WATER SUPPLY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2026 2:52:45 PM
Creation date
7/30/2026 2:36:55 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
7/20/2026
LONG TERM AGREEMENTS - NAME
Zone 7
LONG TERM AGREEMENTS - TYPE
WATER SERVICES AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
20 YR
LONG TERM AGREEMENTS - NOTES
MUNIS #2027022
Document Relationships
ZONE 7 - MUNCICIPAL & INDUSTRIAL WATER SUPPLY (#2027022)
(Message)
Path:
\CITY CLERK\CONTRACTS\Z
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
transmission pipeline, Contractor shall pay for construction of <br /> modifications to the transmission pipeline, including insertion of a new <br /> tee or other connection and associated in-line valves and the isolation <br /> valve on the tee, serving the turnout facility, in addition to any other <br /> costs described in Section 15. <br /> 18. Operations and Damage to Facilities <br /> Each Party shall exercise reasonable care in the performance of its obligations and <br /> rights under this Agreement to ensure that each Party's facilities and operations are not <br /> impaired or damaged. In the event that Contractor, by carrying out its obligations under <br /> this Agreement or in any other course of its operations damages Zone 7 facilities or <br /> structures, including but not limited to turnouts installed under this Agreement, the <br /> Contractor shall reimburse Zone 7 for costs of repairing those facilities. <br /> 19. Inspection of Facilities <br /> Contractor may, upon request, and in the presence of a Zone 7 representative, inspect <br /> its associated turnout facilities. Upon Contractor's request, Zone 7 shall provide Zone 7's <br /> monthly flow measurements and records taken from that Contractor's turnout facilities. <br /> 20. Ranges of Flow <br /> The range of flow rates of water through a turnout facility may vary considerably over <br /> the contract term. A normal range of flow rates for a turnout facility is hereby <br /> established as from 10% to 100% of the maximum approved design flow rate. <br /> Prior to the turnout design, Contractor shall provide Zone 7 with the anticipated <br /> ultimate (future) maximum flow rate and anticipated present design range of flow rates, <br /> as well as anticipated pressure ranges for each on Contractor's side of the turnout <br /> facility. The maximum design flow rate shall not exceed 10 times the minimum design <br /> flow rate for this range in normal installations as approved by Zone 7. <br /> Contractor is responsible for regulating flow demands through the turnout facility such <br /> that the range of flow rates set forth in the turnout design criteria will be maintained. <br /> Zone 7 may at its sole discretion elect to regulate flows. <br /> Zone 7 may modify turnout facilities upon request of Contractor or at such time that the <br /> actual flow rate exceeds the maximum design flow rate or is less than the minimum <br /> design flow rate; provided, however, that flow rates resulting from emergencies shall <br /> not apply to such requirement for modification. Said modification will be at the expense <br /> of the Contractor and payment thereof shall be invoiced to Contractor in accordance <br /> with Section 32. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.