Laserfiche WebLink
23. Carry-over of Groundwater Pumping Quota <br /> In any calendar year, Contractor may carry-over the unextracted portion of its <br /> Groundwater Pumping Quota for extraction from the Main Basin during subsequent <br /> calendar years. Contractor's carry-over or accumulated carry-over shall not exceed 20 <br /> percent of the Contractor's Groundwater Pumping Quota, and shall not include any <br /> Groundwater Pumping Quota waived under the In-Lieu Treated Water provision of <br /> Section 27. <br /> 24. Transfers of Groundwater Pumping Quota <br /> Temporary or permanent transfers of a Contractors Groundwater Pumping Quota are <br /> permitted only (1) between Zone 7 Contractors, and (2) for use within the Zone 7 <br /> boundaries. Such transfers are subject to the written approval of Zone 7, which <br /> approval shall not be unreasonably withheld, provided that the proposed transfer does <br /> not impede the sustainability goals outlined in the Alternative GSP. <br /> 25. Changes in Contractor's Groundwater Pumping Quota <br /> Contractor's Groundwater Pumping Quota shall not be increased without the consent of <br /> the other remaining M&I Contractors with a Groundwater Pumping Quota. <br /> Contractor's Groundwater Pumping Quota shall not be decreased except upon a finding <br /> by the Zone 7 Board of Directors, sitting as the Board of Directors for the Groundwater <br /> Sustainability Agency for the Livermore Valley Groundwater Basin, that such a reduction <br /> is necessary to maintain the Safe Yield of the Livermore Valley Groundwater Basin. <br /> Before enacting such a reduction, Zone 7 shall meet and confer with Contractor <br /> regarding the need for the reduction. Contractor will be provided notice and an <br /> opportunity to comment on any proposed reduction prior to enactment. <br /> 26. Reporting Groundwater Extraction <br /> To the extent applicable to each Contractor, each Contractor shall report the amount of <br /> groundwater extracted from the Main Basin and any water obtained from other sources <br /> (including any water recharged to the Main Basin) in a given month on or before the <br /> fifteenth day of the following month. This report shall be made on a form or forms <br /> provided by or acceptable to Zone 7, and shall include total volume used or extracted, <br /> flow rate, and any other data necessary to confirm total extractions. Contractor shall be <br /> responsible for verifying the data reported to Zone 7 under this Section, including <br /> calibration and testing of meters and associated instrumentation at least annually. <br /> Contractor's measurement and recordation of groundwater extractions shall be subject <br /> to the same provisions for inspection, accuracy and testing of meters and <br /> instrumentation by Zone 7 as is provided to Contractor in Section 10. <br /> 12 <br />