My WebLink
|
Help
|
About
|
Sign Out
MUNCICIPAL & INDUSTRIAL WATER SUPPLY
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
XYZ
>
ZONE 7
>
MUNCICIPAL & INDUSTRIAL WATER SUPPLY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2026 2:52:45 PM
Creation date
7/30/2026 2:36:55 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
7/20/2026
LONG TERM AGREEMENTS - NAME
Zone 7
LONG TERM AGREEMENTS - TYPE
WATER SERVICES AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06 (Long Term Agreements)
LONG TERM AGREEMENTS - DESTRUCTION DATE
20 YR
LONG TERM AGREEMENTS - NOTES
MUNIS #2027022
Document Relationships
ZONE 7 - MUNCICIPAL & INDUSTRIAL WATER SUPPLY (#2027022)
(Message)
Path:
\CITY CLERK\CONTRACTS\Z
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A A E A C A D A E A F A - G A H <br /> TO SCADA SYSTEM - ZONE 7 WATER AGENCY RETAILER <br /> POWER SUPPLY r CONTROL PANEL PLC <br /> 1 ► <br /> __ 1_ 2 <br /> 2 � - <br /> I <br /> I 1 r— <br /> II—*--II <br /> 4 ' I ► <br /> z <br /> W C <br /> p ' j ISOLATION FLOWMETER CHECK CONTROL ISOLATION TO RETAILER-- - <br /> FI VALVE VALVE VALVE VALVE <br /> L_ J SYSTEM <br /> 4 I I -I 1 VAULT/BUILDING - 1 II. <br /> 1 <br /> — ._. — <br /> L.____, ":"._-_-_-_> NODE\. NOTE OPTIONAL <br /> APPURTENANCES <br /> URT NANCES <br /> PTNA PP <br /> 4 I i <br /> 4 <br /> (PRESSURE REGULATION,CHEMICAL <br /> ADDITION) <br /> ZONE 7 WATER AGENCY I RETAILER <br /> OWNED AND MAINTAINED OWNED AND MAINTAINED <br /> 4 ► <br /> -wail INI.- <br /> GENERAL NOTES: <br /> 1. THIS PLAN DIAGRAM DOES NOT INCLUDE OTHER 5 <br /> 5 APPURTENANCES THAT ARE CRITICAL FOR THE FULL <br /> OPERATION OF A TYPICAL ZONE 7 TURNOUT.RETAILER SHALL <br /> WORK WITH ZONE 7 STAFF TO DEVELOP A COMPLETE SET OF <br /> CONSTRUCTION PLANS AND SPECIFICATIONS TO BE REVIEWED <br /> AND APPROVED BY ZONE 7 ENGINEERING. <br /> 4 2. THE FLOW ELEMENT IS IN THE VAULT,AND THE TRANSMITTER ► <br /> SHOULD BE INSTALLED IN THE ZONE 7 PANEL. <br /> 6 BDw�� 'r"°01� BAR Is ONE NCH' ZONE 7 WATER AGENCY "E'" 6 <br /> Dram n AT FULL SCALE SHE, <br /> 1E or 10 <br /> ESB rte u AT ZONE 7 WATER AGENCY D 1- Exhibit DRAWING NO. <br /> Checked YONNSSPARKWAY <br /> SS i, A 100 <br /> ECALIr R.651 IF NOT ONE INCN TYPICAL LAYOUT FOR ZONE 7 TURNOUT <br /> Dat• 9 OF SCALE ACCCRONGLY <br /> FILE NO <br /> FEB <br /> REV DATE BY DeearIptIon 2026 - 1 a T NO X04 OX <br /> Tr" rr r 7 lomat,;Standards Zane 7 Turnout Stondard\2024 Zore 7 turnout S andord\ACRD\'2026 Zone 7'urnwt Standard 2-25-2E 11 25am ss.dhu xREFS WC-227-ZN7-ber ..ost Saved By s c,2-25-26 11.24a+. - <br /> _ . .. r V B * t C V D V E V F : V G V PROJECT Ec <br /> A <br />
The URL can be used to link to this page
Your browser does not support the video tag.