Laserfiche WebLink
to turn around at a closed gate placed at the propsed staging/parking area? Furthermore, it is <br />stated that 16 automobiles spaces and four horse trailer spaces will be provided in the parking <br />lot. At the south parking lot (Tyler Ranch) I believe 74 spaces and three horse trailer spaces are <br />provided. This is a substantial difference. How is the difference justified? Will the lack of <br />parking spaces result in on-street parking? There is no mention of this issue or the problems that <br />would be created if Park visitor parking were to occur on Dublin Canyon Road. An electric gate <br />will be required for the Vinson/EBRPD driveway to keep the public from inadvertently entering <br />the driveway. The EVA and emergency escape to/from my house and four ADU’s and the EBRPD <br />fire crew house must be preserved and not in any way interfered with by the public using the Park. <br />Hydrology <br />The hydrologic response of a natural grass surface is very well understood. When rain falls on a <br />natural grass surface, you have slower runoff, and a low peak flow. The hydrograph rises slowly, <br />peaks at a relatively low flow and recedes gradually. With a paved surface there is no storage. <br />Rain becomes runoff almost immediately. The smooth surface increases flow velocity and causes <br />a higher peak flow. A large volume of water is delivered quickly. The hydrograph rises sharply, <br />peaks much higher than the natural grass surface, and falls quickly. Greater erosion and the risk <br />of downstream flooding occur. <br />It is stated in the report that the project would have bio retention areas with sufficient capacity to <br />ensure that the proposed project would not result in substantial erosion. This remains to be <br />demonstrated, and in fact has not been demonstrated based on my observations of runoff from the <br />paved areas in the Preserve housing development above two small canyons adjacent to the <br />Vinson/EBRPD driveway. Stormwater runoff is “dumped” directly into the two small canyons, <br />Canyons 1 and 2 (location shown below). A large volume of water is delivered quickly into <br />Canyons 1 and 2. Figures 5 and 6 show the completely blocked inlet structures at the entrance to <br />these canyons. Obviously, the inlet structures do not accommodate the high peak flows created by <br />the paved tributary areas in the Preserve. Figures 7 and 8 show the runoff down the Vinson/EBRPD <br />driveway at these two canyons. When the runoff reaches Dublin Canyon Road, it creates flooding <br />across the road. Vehicles which drive through the high flood water covering the road create a <br />“rooster tail”. <br />This unfortunate situation has been created because the stormwater from the paved areas in the <br />Preserve is “dumped” into these two drainages. When the inlet structures become filled with <br />sediment and debris the subsurface stormwater drain system no longer functions. The City of <br />Pleasanton owns the streets and stormwater drain system in the Preserve. The City accepted this <br />poor design from the home developer (who actually created the problem) but of course the <br />developer “walked away” from the problem. Now the City of Pleasanton “owns” the problem. I <br />have contacted the City of Pleasanton regarding this matter and they have done nothing to solve <br />the problem. The runoff down the paved area at the beginning of the driveway has <br />T. Vinson <br />Page 3 of 28 <br />4 <br />CONT <br />5 <br />   <br /><br /> <br /> <br />