My WebLink
|
Help
|
About
|
Sign Out
PC-2026-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 8:27:46 AM
Creation date
8/4/2026 8:25:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Master Responses <br />City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Final EIR <br />2-4 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/released/032626 DV/21480016 Sec02-00 Master Responses.docx <br />those impacts (CEQA Guidelines § 15204(a)). “Reviewers should explain the basis for their <br />comments” and provide data, references, or other evidence to support their comments (CEQA <br />Guidelines § 15204(c)). <br />CEQA requires that the Final EIR address comments submitted during the public comment period <br />that raise significant environmental issues on the adequacy of the Draft EIR (PRC § 21091(d)(2)(B); <br />CEQA Guidelines § 15088(c)). CEQA considerations are limited to significant issues as these relate to <br />potential adverse physical impacts of the proposed project on the environment. General comments <br />and comments that consist merely of speculation or unsupported criticism may be rejected or <br />answered with only a general response. <br />CEQA Guidelines Section 15204, in part states: <br />xx In reviewing draft EIRs, persons and public agencies should focus on the sufficiency of the <br />document in identifying and analyzing the possible impacts on the environment and the ways <br />in which the significant effects of the project might be avoided or mitigated. . . . [R]eviewers <br />should be aware that the adequacy of an EIR is determined in terms of what is reasonably <br />feasible, in light of [specified] factors. . . . CEQA does not require a lead agency to conduct <br />every test or perform all research, study, and experimentation recommended or demanded by <br />commenters. When responding to comments, lead agencies need only respond to significant <br />environmental issues and do not need to provide all information requested by reviewers, as <br />long as a good faith effort at full disclosure is made in the EIR. (CEQA Guidelines § 15204(a)). <br />x Reviewers should explain the basis for their comments, and should submit data or references <br />offering facts, reasonable assumptions based on facts, or expert opinion supported by facts in <br />support of the comments. Pursuant to Section 15064, an effect shall not be considered <br />significant in the absence of substantial evidence.” (CEQA Guidelines § 15204(c)). <br />Pursuant to CEQA, personal opinions expressing general support for, or opposition to, the proposed <br />project are noted and will be included within the administrative record for the proposed project for <br />consideration by the City, but do not require a specific written response if they do not relate to a <br />significant environmental issue that is addressed within the Draft EIR and/or otherwise within the <br />purview of CEQA. Likewise, opinions about the general desirability, merits, and/or purely economic, <br />social, or political considerations of the proposed project are not within the purview of CEQA and do <br />not require a specific written response in this Final EIR. See also Master Response 1, Non-CEQA <br />Issues Not Addressed in the Final EIR, above. <br />In cases where the commenter provides an opinion and/or generalized concerns about the merits of <br />the proposed project and/or the scope and nature of the environmental review but does not identify <br />any particular issue concerning the sufficiency of the Draft EIR, the City notes the opinion in this <br />Final EIR for informational purposes and consideration by the decision-makers as part of the public <br />hearing process on the merits of the proposed project. <br />Where a commenter offers unsubstantiated assertions about an environmental issue or the <br />adequacy of the Draft EIR, the City notes the assertion in this Final EIR for informational purposes <br /> <br /><br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.