My WebLink
|
Help
|
About
|
Sign Out
PC-2026-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 8:27:46 AM
Creation date
8/4/2026 8:25:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Response to Public Meeting Verbal Comments Final EIR <br /> <br /> <br />4-2 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec04-00 Response to Public Meeting Verbal Comments.docx <br />approach to the community or part of the old Lincoln Highway Bridge. Therefore, I'm in the strong <br />support of the traffic light to be installed at Canyon Meadows in Dublin Canyon. This is a crucial <br />piece of the Ponderosa proposal without which I would have a hard time lending support. Related, <br />I'm in support of measures to make Dublin Canyon safer for pedestrians. Again, the bridge on the <br />westbound approach to Canyon Meadows has a very narrow shoulder and which cars routinely cut <br />as it's an apex to the bend in the road. This makes a walk to BART a perilous proposition or watching <br />kids try to ride bicycles home from school. So, I had a clarifying question about pedestrian <br />improvements. I believe I read that there is going to be some sidewalks and crosswalks in <br />conjunction with the East Bay Regional Park . . . I also wanted clarification on the construction work <br />is probably going to add a fair bit of traffic. So, I wanted some clarification on the timing for the um <br />traffic signal. Will that be at the tail end of all the construction or ideally at the beginning of the <br />construction? <br />Response to GARDNER <br />As noted on page 2-27 in Chapter 2, Project Description, of the Draft EIR, the proposed project <br />would include the construction of a traffic signal at the Dublin Canyon Road and Canyon Meadows <br />intersection. The proposed project would also include construction of 6-foot-wide bike lanes on both <br />sides of Dublin Canyon Road along the project frontage, as well as a 5-foot-wide sidewalk or pathway <br />on Dublin Canyon Road to the East Bay Regional Park District (EBRPD) trailhead and staging area. <br />As stated by the project applicant during the Planning Commission public meeting, the traffic signal <br />would not be constructed first, due to construction vehicle access, economic, and permitting <br />constraints. This comment is included in the administrative record and will be provided to the <br />decision makers for review and consideration. The comment did not provide new, substantial <br />evidence with respect to the disposition of significant environmental impacts evaluated in the Draft <br />EIR. Therefore, no further response is required. <br />Sarah Jane Hollister (HOLLISTER) <br />Hi. Hello. I'm Sarah Jane Hollister. Welcome. I think I know some of you. I've been a resident of <br />Pleasanton for over 55 years and have been a homeowner and have taught in Pleasanton also for 35 <br />years. And uh when I was ready to downsize and retire, I thought Dublin Canyon Meadows would be <br />the perfect place to retire and to downsize. And it's been wonderful development. But in the course <br />of this time and I was involved in 2017 to 2019 also um traffic has gotten way more than what it was <br />in 2017 and 2019 and um I am very concerned. It's difficult to see that map and to see where the <br />stoplight is. And it the stoplight was important in 2017 and 2019, but it's even important now. Um, a <br />few years ago, as a matter of fact, my immediate neighbor uh there's a curve where that bridge is <br />and it doesn't give you enough visual sight. And of course now um Dublin Canyon Road I call 580 <br />Annex because we have traffic during commute time constantly and you have to hold your breath <br />leaving our complex and before somebody is majorly injured. I am happy to see this, but I'm. On the <br />map, it's difficult to actually see where those stop lights are going to be, where the lefthand turn <br />lane’s going to be. I don't even know where the equestrian buildings are going to be, where the <br />parking for that is. It just seems like we're putting more and more on this road. And um maybe <br />there's better plans than the one that's up here, but I would hope that the Planning Commission <br />would look at all of that. We have 244 homes in Dublin Canyon Meadows. That's a lot of people <br />exiting and entering there every day, as well as the church that's across the road. I think it's very <br /> <br /><br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.