My WebLink
|
Help
|
About
|
Sign Out
PC-2026-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 8:27:46 AM
Creation date
8/4/2026 8:25:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />Errata Final EIR <br /> <br /> <br />5-16 FirstCarbon Solutions <br />https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/EIR/4 - Final EIR/21480016 Sec05-00 Errata.docx <br />Monitoring Program (PRIMMP). The project proponent/developer shall submit the <br />PRIMMP to and receive approval from the City/Lead Agency. The PRIMMP will <br />describe, in addition to industry standards and SVP standards, the level of <br />monitoring required in the project area, qualifications of the Paleontological monitor <br />for grading operations, and identification of personnel with authority and <br />responsibility to temporarily halt or divert grading equipment to allow for recovery <br />of large specimens. Furthermore, the PRIMMP shall provide direction for any fossil <br />discoveries to be immediately reported, means and methods to be employed to <br />quickly salvage fossils as they are unearthed to avoid construction delays, sampling <br />procedures and protocol for collecting and processing sediments and specimens, <br />fossil identification, and reporting and curation procedures to be employed. The <br />report will include the paleontological records search conducted at the UCMP, <br />pertinent exhibits, maps and reference procedures for reporting of findings. <br />MM GEO-26b On the first day of ground disturbance and prior to the start of any ground- <br />disturbing activities, the qualified professional Paleontologist that meets SVP <br />Standard Procedures shall prepare and conduct a project-wide Worker <br />Environmental Awareness Program (WEAP) training. The WEAP training shall include <br />a review of applicable federal, State, and local regulations related to paleontological <br />resources; recognition and understanding of significant paleontological resources <br />pertinent to the geography and geology of the region and the types of <br />paleontological resources that may be encountered; procedures to be followed in <br />the event that such resources are encountered; the protocols that apply in the event <br />of inadvertent discovery, including who to contact and appropriate avoidance <br />measures until the find(s) can be properly evaluated and any other appropriate <br />protocols. In the event construction crews are phased in, additional training will be <br />conducted for new construction personnel. <br />MM GEO-26c During ground-disturbing construction activities, full time paleontological <br />monitoring shall be conducted by a qualified Paleontological Resource Monitor <br />meeting SVP standards and best practices, under the supervision of the Principal <br />Paleontologist. Monitoring shall be restricted to areas that intrude into the <br />Claremont shale and Monterey formations (i.e., generally below 2 feet) and <br />undisturbed subsurface areas of marine sedimentary rock units of Miocene-age. In <br />the event potentially significant paleontological resources are encountered during <br />ground-disturbing activities, construction-related activities within 50 feet of the find <br />shall stop. No excavation or other disturbances shall occur within the buffer zone <br />until the find has been evaluated by the project Paleontologist. The Paleontologist <br />shall collect samples of sediments which are likely to contain the remains of small <br />fossil invertebrates, vertebrates, or microfossils. If the resources are found to be <br />significant, protocol for collecting and processing sediments and specimens, as <br />outlined in the Paleontological Resource Impact Mitigation Monitoring Program <br />(PRIMMP), is to be implemented. The Paleontologist shall have the power to <br />temporarily halt or divert grading equipment to allow for removal of abundant or <br /> <br /><br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.