Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />FirstCarbon Solutions 1 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />CEQA FINDINGS OF FACT AND STATEMENT OF OVERRIDING <br />CONSIDERATIONS <br />1.1 - Introduction <br />In accordance with requirements under the California Environmental Quality Act (CEQA) and based <br />on the nature and scope of the proposed project, the City of Pleasanton (City), in its discretion as <br />Lead Agency, directed the preparation of a Draft Environmental Impact Report and attached <br />appendices (collectively, Draft EIR). The Draft EIR for the Hidden Canyon Residences and Preserve <br />Project (proposed project) provides a detailed explanation related to the preparation of this <br />environmental document as well as information regarding the applicable regulatory framework, the <br />various project components and the project site, along with a robust analysis of the potential <br />environmental impacts that could occur as a result of the construction and operation of the <br />proposed project. As detailed more fully below, the Draft EIR was prepared, noticed, published, <br />circulated, reviewed and completed in full compliance with CEQA. The Draft EIR identifies significant <br />effects on the environment, which may occur as a result of implementation of the proposed project <br />and identifies those mitigation measures that would reduce impacts to below a level of significance. <br />After circulating the Draft EIR for a 60-day public review and comment period (including a required <br />45-day and a 15-day extension), the City of Pleasanton prepared a Final Environmental Impact <br />Report (Final EIR). The Final EIR (consisting of the Introduction, Errata, and Responses to Written <br />Comments) incorporates the Draft EIR by reference in its entirety. The City of Pleasanton is required <br />to certify the Final EIR pursuant to CEQA Guidelines Section 15090 prior to approving a project and <br />make certain findings with respect to these impacts pursuant to CEQA Guidelines Section 15091. <br />The CEQA Guidelines provide that prior to approving a project, the Lead Agency shall certify that: <br />1) The Final EIR has been completed in compliance with CEQA; <br />2) The Final EIR was presented to the decision-making body of the lead agency, and that the <br />decision-making body reviewed and considered the information contained in the Final EIR <br />prior to approving the project; and <br />3) The Final EIR reflects the lead agency’s independent judgment and analysis. (CEQA <br />Guidelines § 15090). <br /> <br />CEQA Guidelines Section 15091 further explains that: <br />No public agency shall approve or carry out a project for which an EIR has been completed which <br />identifies one or more significant environmental effects of the project unless the public agency <br />makes one or more written findings for each of those significant effects, accompanied by a brief <br />explanation of the rationale for each finding. The possible findings are: <br />(a) Changes or alterations have been required in, or incorporated into, the project which <br />avoid or substantially lessen the significant environmental effect as identified in the Final <br />EIR. <br />   <br /><br /> <br /> <br />