Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />FirstCarbon Solutions 3 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />the environmental determinations about the proposed project’s significant impacts before and after <br />mitigation, and summarize the proposed project’s individual and cumulative impacts. These Findings <br />do not attempt to describe the full analysis of each environmental impact. Instead, they provide a <br />summary description of each significant impact and the applicable mitigation measures identified in <br />the EIR and adopted by the City of Pleasanton, and state the conclusions regarding the significance <br />of each impact after incorporation of the identified mitigation measures. A comprehensive <br />explanation of these environmental impact conclusions can be found in the EIR, as supplemented <br />and explained in staff reports and materials presented by the project applicant, the City of <br />Pleasanton staff, and various project consultants, and other relevant materials in the administrative <br />record. The EIR is incorporated into these Findings in its entirety. Without limitation, this <br />incorporation is intended to elaborate on the scope and nature of mitigation measures, the basis for <br />determining the significance of impacts, the comparative analysis of alternatives, and the reasons for <br />approving the proposed project in spite of the potential for associated significant and unavoidable <br />adverse impacts. <br />1.3 - Project Summary <br />1.3.1 - Project Description <br />Residential <br />The proposed project would result in the construction of 28 new detached single-family residential <br />units, three of which would include accessory dwelling unit (ADU) plans ranging in size from 394 to <br />720 square feet. The proposed project would also demolish two existing homes owned by the Lester <br />Family on two separate existing lots, Lots 29 and 30, for the construction of two new single-family <br />homes in the same location. All residential lots would have a maximum lot size of approximately <br />14,884 square feet. Residential units would contain three different floor plans ranging from 3,750 to <br />4,250 square feet, with four architectural styles: Rustic Villa (Mediterranean), Spanish, Prairie, and <br />Farmhouse. All plans would feature classic elements, details, color schemes, and stonework to fit in <br />or be congruent with the rolling landscape of the development site and open space. <br />The proposed 28 new detached single-family residential units would be accessible off a landscaped <br />gated entry off Dublin Canyon Road. Three new internal roadways (Street A, Street B, and Court C) <br />would provide connection to the project site from Dublin Canyon Road. An access road at the end of <br />Street A would be provided to allow continued access for grazing livestock on the open space areas <br />outside of the City’s Urban Growth Boundary (UGB). The proposed project includes construction of <br />sidewalks along Street A, Street B, and Court C. The proposed project also includes the construction <br />of a 5-foot-wide sidewalk along the front of lot 30 along Dublin Canyon Road and a pedestrian <br />crossing at Canyon Meadows that would facilitate access to the proposed East Bay Regional Parks <br />District (EBRPD) trailhead. Crosswalks are also proposed within the development site. <br />Access to the two proposed homes on Lots 29 and 30 would retain the existing entrance on Dublin <br />Canyon Road. This entrance would be converted into a paved loop that would connect to the EBRPD <br />easement to the east of the existing property. Bollards would be installed at the Lester driveway <br />connection to Dublin Canyon Road and a private access gate would be constructed at the loop’s <br />connection with the EBRPD easement. A 5-foot-wide sidewalk or pathway would also be constructed <br />   <br /><br /> <br /> <br />