My WebLink
|
Help
|
About
|
Sign Out
PC-2026-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 8:27:46 AM
Creation date
8/4/2026 8:25:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />16 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br /> <br />EACCS-specific CRLF Avoidance Minimization Measures: <br />xx If aquatic habitat is present, a qualified Biologist shall stake and flag an exclusion <br />zone prior to activities. The exclusion zone shall be fenced with orange <br />construction zone and erosion control fencing (to be installed by construction <br />crew). The exclusion zone shall encompass the maximum practicable distance <br />from the work site and at least 500 feet from the aquatic feature wet or dry. <br />x A qualified Biologist shall conduct pre-construction surveys prior to construction <br />activities (before groundbreaking). If individuals are found, work shall not begin <br />until they are moved out of the construction zone to a United States Fish and <br />Wildlife Service (USFWS) or California Department of Fish and Wildlife (CDFW) <br />approved relocation site. <br />x A Service-approved Biologist shall be present for initial ground-disturbing <br />activities. <br />x If the work site is within the typical dispersal distance (contact USFWS/CDFW for <br />latest research on this distance for species of interest) of potential breeding <br />habitat, barrier fencing shall be constructed around the worksite to prevent <br />amphibians from entering the work area. Barrier fencing shall be removed within <br />72 hours of completion of work. <br />x No monofilament plastic shall be used for erosion control. <br />x Construction personnel shall inspect open trenches in the morning and evening <br />for trapped amphibians. <br />x A qualified Biologist possessing a valid Endangered Species Act Section 10(a)(1)(A) <br />permit or Service approved under an active biological opinion, shall be contracted <br />to trap and to move amphibians to nearby suitable habitat if amphibians are <br />found inside fenced area. <br />x Work shall be avoided within suitable habitat from October 15 (or the first <br />measurable fall rain of 1 inch or greater, to May 1). <br /> <br />In addition, the EACCS specifies that a project shall obtain an Incidental Take Permit <br />if occupied habitat is adjacent to the site and suitable habitat is on the project site. <br />Compensation <br />The project proposes to preserve in perpetuity approximately 104.6 acres of the <br />project site as open space outside of the grading envelope. This amount of open <br />space would more than sufficiently compensate for any loss of CRLF upland habitat. <br />Additionally, to ensure that mitigation habitat meets or exceeds the value of the <br />habitat lost to development. Additionally, Focal Species Impact/Mitigation Scoring <br />Sheets, located in Appendix E of the EACCS, were used as part of the assessment for <br />suitability of mitigation lands for CRLF. Standardized mitigation ratios for CRLF, <br />according to Table 3-7 in the EACCS, are 3:1 if the development area is within critical <br />habitat and 2.5:1 if the development area is outside of critical habitat. The vast <br />majority of the development area of the project is outside of critical habitat; <br /> <br /><br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.