Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />FirstCarbon Solutions 31 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />The Lead Agency finds that MM BIO-5 is feasible, is adopted, and will further reduce impacts related <br />to local tree preservation policies or ordinances to less than significant. Accordingly, the Lead Agency <br />finds that, pursuant to Public Resources Code Section 21081(a)(1) and CEQA Guidelines Section <br />15091(a)(1), changes or alterations have been required in, or incorporated into, the proposed <br />project that mitigate or avoid the potentially significant impacts as identified in the EIR. Therefore, <br />impacts associated with local tree preservation policies or ordinances would be less than significant <br />with mitigation incorporated. <br />Cumulative Biological Resources Impact: The proposed project would not have a cumulatively <br />considerable impact with respect to biological resources. <br />Findings: Less than significant impact with mitigation incorporated. (Draft EIR, p. 3.3-46 to 3.3- <br />49). Changes or alterations have been required in, or incorporated into, the project <br />which avoid or substantially lessen the significant environmental effects as identified <br />in the EIR. (CEQA Guidelines § 15091(a)(1)). <br />Mitigation Measures <br />Implement MM BIO-1a through MM BIO-1i, MM BIO-3, and MM BIO-5. <br />Facts in Support of Findings: Cumulative projects would be required to comply with all applicable <br />federal, State, and local laws, regulations, and policies related to potential impacts on biological <br />resources. Cumulative projects would be required to adhere to standard pre-construction surveys <br />and avoidance procedures for wildlife species (see, e.g., MM BIO-1a through MM BIO-1i). <br />Cumulative projects would also be required to implement applicable Avoidance and Minimization <br />Measures for riparian habitat, woodlands, and jurisdictional waters (see, e.g., MM BIO-3). <br />Cumulative projects would also be required to abide by local policies and ordinances such as the <br />City’s Tree Protection Ordinance and would be required to implement a tree preservation plan or <br />similar measures as needed (MM BIO-5). Therefore, through compulsory adherence to all applicable <br />local, State, and federal regulations and through implementation of MM BIO-1a through MM BIO-1i, <br />MM BIO-3, and MM BIO-5, cumulative biological resources impacts would be reduced to a level that <br />is less than significant and the proposed project’s contribution to the less than significant cumulative <br />impact would not be cumulatively considerable. <br />The Lead Agency finds that MM BIO-1a through MM BIO-5 are feasible, are adopted, and will further <br />reduce impacts related to cumulative biological impacts. Accordingly, the Lead Agency finds that, <br />pursuant to Public Resources Code Section 21081(a)(1) and CEQA Guidelines Section 15091(a)(1), <br />changes or alterations have been required in, or incorporated into, the proposed project that <br />mitigate or avoid the potentially significant impacts as identified in the EIR. Therefore, impacts <br />associated with cumulative impacts would be less than significant with mitigation incorporated. <br />1.6.6 - Impact CUL-2: Archaeological Resources <br />Impact CUL-2: The proposed project could cause a substantial adverse change in the significance of <br />an archaeological resource pursuant to Section 15064.5. <br />   <br /><br /> <br /> <br />