Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />FirstCarbon Solutions 39 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />of inadvertent discovery, including who to contact and appropriate avoidance <br />measures until the find(s) can be properly evaluated and any other appropriate <br />protocols. In the event construction crews are phased in, additional training will be <br />conducted for new construction personnel. <br />MM GEO-6c During ground-disturbing construction activities, full time paleontological <br />monitoring shall be conducted by a qualified Paleontological Resource Monitor <br />meeting SVP standards and best practices, under the supervision of the Principal <br />Paleontologist. Monitoring shall be restricted to areas that intrude into the <br />Claremont shale and Monterey formations (i.e., generally below 2 feet) and <br />undisturbed subsurface areas of marine sedimentary rock units of Miocene-age. In <br />the event potentially significant paleontological resources are encountered during <br />ground-disturbing activities, construction-related activities within 50 feet of the find <br />shall stop. No excavation or other disturbances shall occur within the buffer zone <br />until the find has been evaluated by the project Paleontologist. The Paleontologist <br />shall collect samples of sediments which are likely to contain the remains of small <br />fossil invertebrates, vertebrates, or microfossils. If the resources are found to be <br />significant, protocol for collecting and processing sediments and specimens, as <br />outlined in the Paleontological Resource Impact Mitigation Monitoring Program <br />(PRIMMP), is to be implemented. The Paleontologist shall have the power to <br />temporarily halt or divert grading equipment to allow for removal of abundant or <br />large specimens. If no significant specimens are encountered during ground- <br />disturbing activities, full time monitoring can be reduced to spot-checking or <br />suspended entirely, at the discretion of the qualified professional Paleontologist and <br />the City/Lead Agency. <br />MM GEO-6d The Paleontological Monitor shall keep a daily log and photographic record of all <br />activities involving ground disturbance during the construction phase, as well as <br />adhering to the procedures outlined in the Paleontological Resource Impact <br />Mitigation Monitoring Program (PRIMMP). The Monitor’s daily activities, findings, <br />etc. shall be submitted to the Principal Paleontologist. All relevant details and <br />findings shall be summarized in a report that shall be prepared at the completion of <br />ground-disturbing activities and submitted to the City/Lead Agency and UCMP <br />repository. Additionally, specimens shall be identified and curated into a permanent <br />accredited repository (such as the University of California Museum of Paleontology <br />[UCMP]) with permanent curation and retrievable storage. <br />Facts in Support of Findings: No fossil localities within the project boundaries during the University <br />of California Museum of Paleontology (UCMP) Locality Search Online Database and records search <br />conducted on March 25, 2025. Additionally, surficial deposits on most of the project site consist of <br />colluvium and residual soils ranging from approximately 2-11 feet in depth, which have low <br />paleontological potential, subsurface conditions consist of high paleontological potential rock units <br />from the Claremont shale member and the Monterey Formation, which have been associated with <br />vertebrate and invertebrate localities in the geographic region. Therefore, subsurface excavations <br />   <br /><br /> <br /> <br />