Laserfiche WebLink
City of Pleasanton—Hidden Canyon Residences and Preserve Project <br />CEQA Findings of Fact and Statement of Overriding Considerations <br /> <br /> <br />FirstCarbon Solutions 49 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/FOF/21480016 Pleasanton Hidden Canyon Residences and Preserve Project FOF.docx <br />As such, this alternative would result in greater impacts with respect to construction-related air <br />quality and construction noise. <br />This alternative would result in slightly lesser impacts with respect to biological resources; seismic- <br />induced ground failure; seismic-induced liquefaction; landslides; hazards and hazardous materials; <br />and wildfire. <br />This alternative would result in similar impacts with respect to aesthetics, light, and glare; agriculture <br />and forestry resources; operational air quality; cultural resources and tribal cultural resources; <br />energy; subsidence; strong seismic shaking; greenhouse gas emissions; hydrology and water quality; <br />land use and planning; mineral resources; operational noise; population and housing; public <br />services; recreation; transportation; and utilities and service systems. <br />Additionally, the project applicant does not own or control Site 26. Implementation of this <br />alternative would require acquisition of the property from a third party, and there is no evidence in <br />the record demonstrating that such acquisition is reasonably foreseeable within the project <br />timeframe or on terms that would allow timely development. The uncertainty associated with <br />obtaining site control introduces substantial risk related to project scheduling, financing, and <br />implementation, and could delay or preclude realization of all of the project objectives. <br />Because of changes in variations in site features relative to the site proposed under the proposed <br />project, this alternative would be required to use some mitigation measures required for the <br />proposed project and mitigation measures for construction-related air quality and noise impacts that <br />are not required for the proposed project. Therefore, most of the environmental impacts under this <br />alternative would be either similar or greater than those of the proposed project. Furthermore, this <br />alternative would either partially meet or fail to meet project objectives related to: <br />1. Providing open space areas across the project site and dedicating land to the EBRPD to be <br />permanently preserved. <br />2. Providing public access, including a public parking/staging area and a trail connection, to <br />Pleasanton Ridge. <br />3. Preserving the open space character at the edges of the City, in accordance with the City of <br />Pleasanton General Plan Community Character Element. <br />4. Improving Dublin Canyon Road to increase access and safety by constructing roadways, <br />sidewalks, and bike lanes. <br /> <br />Finding: Based on the discussion in the EIR and all other evidence before it, the Lead Agency <br />finds that the Alternative Site Alternative advances several project objectives to a <br />lesser degree than the proposed project would and therefore represent a less <br />desirable policy outcome as compared with the proposed project, which would fully <br />meet the project objectives and would bring the City of Pleasanton all of the <br />benefits set forth in the Statement of Overriding Considerations. <br />   <br /><br /> <br /> <br />