My WebLink
|
Help
|
About
|
Sign Out
PC-2026-08
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2026
>
PC-2026-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2026 8:27:46 AM
Creation date
8/4/2026 8:25:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/22/2026
DESTRUCT DATE
PERMANENT
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pleasanton <br />Hidden Canyon Residences and Preserve Project Preface <br /> <br /> <br />FirstCarbon Solutions 1 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480016/MMRP/21480016 Hidden Canyon Residences and Preserve Project MMRP.docx <br />PREFACE <br />Section 21081.6 of the California Environmental Quality Act (CEQA) and CEQA Guidelines Section <br />15097 require a Lead Agency to adopt a Mitigation Monitoring and Reporting Program (MMRP) <br />whenever it adopts a Environmental Impact Report (EIR) in conjunction with a project approval. The <br />purpose of the MMRP is to ensure compliance with the mitigation measures occurs during project <br />implementation. <br />The Draft EIR prepared for the proposed Hidden Canyon Residences and Preserve Project (proposed <br />project) concluded that project implementation could result in potentially significant effects on the <br />environment and mitigation measures were incorporated into the proposed project or are required <br />as a condition of project approval that reduce these potential impacts to a less than significant level. <br />This MMRP documents how and when the mitigation measures adopted by the Lead Agency will be <br />implemented and confirms that potential environmental impacts are reduced to less than significant <br />levels as identified in the Draft EIR. <br />This document does not discuss those subjects that the environmental analysis demonstrates would <br />result in less than significant impacts and for which no mitigation was proposed or necessary. <br /> <br /> <br /><br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.